SEARCHING
... please wait

Aoulouz

Download PDF data sheet
Aoulouz completed
Aoulouz completed

Particulars

Owner: unknown

Designer: Coyne et Bellier/Ingema

Contractor: Matrap/Sepico

Statistics

Type: Gravity

Purpose(s): Flood Control / Groundwater Recharge / Irrigation

Reservoir capacity: 110 m3x106

Height: 79 metres

Length: 476 metres

Volume of RCC: 680 m3x103

Total volume: 850 m3x103

Construction Dates

Start of Project: 03/88 (March 1988)

Start of RCC: 11/89 (November 1989)

End of RCC: 09/90 (September 1990)

End of Project: 11/91 (November 1991)

Country: Morocco

River: Souss

DMS Co-ordinates: 30˚41'34.87"N, 08˚08'15.88"W

DD Co-ordinates: 30.69302, -8.137744

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
0.85Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.85Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
500500

Cementitious material

Cement (kg/m3)
120
90
Pozzolan (kg/m3)Pozzolan Type
0Milled sand
0