Belo Monte
Download PDF data sheet
Particulars
Owner: unknown
Designer: IEP and CCBM
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 5 m3x106
Height: 74 metres
Length: 680 metres
Volume of RCC: 63 m3x103
Total volume: 2208 m3x103
Construction Dates
Start of Project: —/11 (— 2011)
Start of RCC: —/13 (— 2013)
End of RCC: —/16 (— 2016)
End of Project: —/20 (— 2020)
Country: Brazil
River: Xingu
DMS Co-ordinates: 2˚38'44.67"S, 51˚59'58.5"W
DD Co-ordinates: -2.645742, -51.999584
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
1.20 |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|