SEARCHING
... please wait

Divaresh

Download PDF data sheet
Photo coming soon

Particulars

Owner: Gilan Province Water Authority

Designer: Rey-Ab

Contractor: Gohar Rood Gilan

Statistics

Type: Gravity

Purpose(s): Irrigation / Water Supply

Reservoir capacity: 3 m3x106

Height: 45 metres

Length: 195 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: —/13 (— 2013)

Start of RCC: —/15 (— 2015)

End of RCC: —/24 (— 2024)

End of Project: —/26 (— 2026)

Country: Iran

River: Kharshak

DMS Co-ordinates: 36˚53'0.01"N, 49˚31'6.00"E

DD Co-ordinates: 36.883335, 49.518333

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type