Lai Chau
Download PDF data sheet
Particulars
Owner: unknown
Designer: PECC1 (Power Engineering Consulting Company Nº1)
Contractor: Song Da Corporation (SDC)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1215 m3x106
Height: 131 metres
Length: 620 metres
Volume of RCC: 1884 m3x103
Total volume: 2500 m3x103
Construction Dates
Start of Project: 06/10 (June 2010)
Start of RCC: 03/13 (March 2013)
End of RCC: 05/15 (May 2015)
End of Project: 07/17 (July 2017)
Country: Vietnam
River: Song Da (Black River)
DMS Co-ordinates: 22˚08'16.81"N, 102˚59'1.57"E
DD Co-ordinates: 22.138002, 102.983772
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
160 | Low-lime flyash (ASTM Class F) |