Minas San Francisco
Download PDF data sheet
Particulars
Owner: unknown
Designer: Geodata-Astec
Contractor: Harbin Electric International
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 14 m3x106
Height: 78 metres
Length: 209 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/14 (— 2014)
End of RCC: —/17 (— 2017)
End of Project: 08/18 (August 2018)
Country: Ecuador
River: Jubones
DMS Co-ordinates: 3˚18'58"S, 79˚28'53.18"W
DD Co-ordinates: -3.31611, -79.481438
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|