SEARCHING
... please wait

Minas San Francisco

Download PDF data sheet
Minas San Francisco completed
Minas San Francisco completed

Particulars

Owner: unknown

Designer: Geodata-Astec

Contractor: Harbin Electric International

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 14 m3x106

Height: 78 metres

Length: 209 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /12 ( 2012)

Start of RCC: /14 ( 2014)

End of RCC: /17 ( 2017)

End of Project: 08/18 (August 2018)

Country: Ecuador

River: Jubones

DMS Co-ordinates: 3˚18'58"S, 79˚28'53.18"W

DD Co-ordinates: -3.31611, -79.481438

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type