R'mil

Download PDF data sheet
R'mil completed
R'mil completed

Particulars

Owner: unknown

Designer: Coyne et Bellier

Contractor: Engil & Adriano J.V.

Statistics

Type: Gravity

Purpose(s): Irrigation

Reservoir capacity: 44 m3x106

Height: 18 metres

Length: 260 metres

Volume of RCC: 64 m3x103

Total volume: 160 m3x103

Construction Dates

Start of Project: 08/99 (August 1999)

Start of RCC: 10/00 (October 2000)

End of RCC: 05/01 (May 2001)

End of Project: 11/01 (November 2001)

Country: Tunisia

River: R’mil

DMS Co-ordinates: 36˚18'7.54"N, 9˚30'9.57"E

DD Co-ordinates: 36.302094, 9.502658

Facings

Upstream

SlopeType
VerticalRCC supported by fill shoulders

Downstream

SlopeType
0.90Mechanically compacted unformed face of RCC

Spillway

SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -