Ulu Jelai/Susu
Download PDF data sheet
Particulars
Owner: unknown
Designer: SMEC International/SMEC Malaysia JV
Contractor: TMSC (Tindakan Mewah Sdn Bhd and Salini Malaysia Consortium)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 18 m3x106
Height: 90 metres
Length: 513 metres
Volume of RCC: 731 m3x103
Total volume: 747 m3x103
Construction Dates
Start of Project: 03/11 (March 2011)
Start of RCC: 03/14 (March 2014)
End of RCC: 09/15 (September 2015)
End of Project: 07/16 (July 2016)
Country: Malaysia
River: Bertam, Telom and Lemoi
DMS Co-ordinates: 4˚26'06.29"N, 101˚32'37.42"E
DD Co-ordinates: 4.435081, 101.543732
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 2400 |
Cementitious material
Cement (kg/m3) |
---|
100 |
95 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |