Agdz
Download PDF data sheet
Photo coming soon

Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 247 m3x106
Height: 110 metres
Length: 317 metres
Volume of RCC: 833 m3x103
Total volume: 993 m3x103
Construction Dates
Start of Project: 05/16 (May 2016)
Start of RCC: 03/19 (March 2019)
End of RCC: 09/20 (September 2020)
End of Project: 06/21 (June 2021)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|