Çamlica III
Download PDF data sheet
Çamlica III under construction

Particulars
Owner: Akfen Energy
Designer: YolsuEngineering Services Inc.
Contractor: Akfen Construction Industry and Trade Inc.
Statistics
Type: Hardfill
Purpose(s): Flood Control / Hydropower
Reservoir capacity: 1 m3x106
Height: 52 metres
Length: 186 metres
Volume of RCC: 160 m3x103
Total volume: 182 m3x103
Construction Dates
Start of Project: 04/08 (April 2008)
Start of RCC: 04/10 (April 2010)
End of RCC: 12/10 (December 2010)
End of Project: 04/11 (April 2011)
Country: Turkey
River: Zamanti
DMS Co-ordinates: 37˚54'3"N, 35˚30'14"E
DD Co-ordinates: 37.900833, 35.503887
Facings
Upstream
Slope | Type |
---|---|
0.70 | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
88 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
37 | Low-lime flyash (ASTM Class F) |