Atance
Download PDF data sheet
Particulars
Owner: unknown
Designer: EPTISA
Contractor: Dragados y Construcciones S.A.
Statistics
Type: Gravity
Purpose(s): Irrigation
Reservoir capacity: 35 m3x106
Height: 45 metres
Length: 184 metres
Volume of RCC: 65 m3x103
Total volume: 75 m3x103
Construction Dates
Start of Project: 07/96 (July 1996)
Start of RCC: 04/97 (April 1997)
End of RCC: 07/97 (July 1997)
End of Project: 10/97 (October 1997)
Country: Spain
River: Salado
DMS Co-ordinates: 41˚4'31.27"N, 2˚47'6.13"W
DD Co-ordinates: 41.075352, -2.785036
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
57 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
133 | Low-lime flyash (ASTM Class F) |