Lower Molonglo Bypass Storage
 Download PDF data sheet
Lower Molonglo Bypass Storage completed 

Particulars
Owner: unknown
Designer: ACT Electricity and Water
Contractor: Fletcher White J.V.
Statistics
Type: Gravity
Purpose(s): Pollution Control
Reservoir capacity: 1 m3x106
Height: 32 metres
Length: 120 metres
Volume of RCC: 22 m3x103
Total volume: 27 m3x103
Construction Dates
Start of Project: 02/94 (February 1994)
Start of RCC: 06/94 (June 1994)
End of RCC: 08/94 (August 1994)
End of Project: 11/94 (November 1994)
Country: Australia
River: Unnamed creek
DMS Co-ordinates: 35˚14'40.17"S, 148˚58'6.43"E
DD Co-ordinates: -35.244492, 148.967773
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 96 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 64 | Low-lime flyash (ASTM Class F) | 

 
  
 