Nagashima sediment dam
Download PDF data sheet
Nagashima sediment dam completed

Particulars
Owner: Ministry of Construction
Designer: Ministry of Construction
Contractor: Nishimatu Construction Co., Ltd. and Toda Construction Co., Ltd. J.V.
Statistics
Type: Hardfill
Purpose(s): unknown
Reservoir capacity: 1 m3x106
Height: 33 metres
Length: 127 metres
Volume of RCC: 23 m3x103
Total volume: 55 m3x103
Construction Dates
Start of Project: 03/97 (March 1997)
Start of RCC: 04/99 (April 1999)
End of RCC: 12/99 (December 1999)
End of Project: 08/00 (August 2000)
Country: Japan
River: Ohi
DMS Co-ordinates: 35˚9'59.1"N, 138˚9'20.1"E
DD Co-ordinates: 35.166416, 138.155579
Facings
Upstream
Slope | Type |
---|---|
1.20 | Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
1.20 | Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 500 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
40 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | Ground-granulated blast-furnace slag |