Sep

Download PDF data sheet
Sep completed
Sep completed

Particulars

Owner: unknown

Designer: Somival

Contractor: Bec Frères and Ballot (J.V.)

Statistics

Type: Gravity

Purpose(s): Irrigation

Reservoir capacity: 5 m3x106

Height: 46 metres

Length: 145 metres

Volume of RCC: 49 m3x103

Total volume: 58 m3x103

Construction Dates

Start of Project: 04/93 (April 1993)

Start of RCC: 09/93 (September 1993)

End of RCC: 01/94 (January 1994)

End of Project: 03/94 (March 1994)

Country: France

River: Sep

DMS Co-ordinates: 46˚01'47.92"N, 03˚01'25.51"E

DD Co-ordinates: 46.02998, 3.023753

Facings

Upstream

SlopeType
VerticalReinforced conventional concrete cast before RCC placement

Downstream

SlopeType
0.72Mechanically compacted unformed face of RCC

Spillway

SlopeType
0.72RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
120ROLAC (mixture of flyash and slag with or without limestone fines)