Uzundere
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Irrigation
Reservoir capacity: 1 m3x106
Height: 42 metres
Length: 59 metres
Volume of RCC: 35 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/16 (— 2016)
Start of RCC: —/20 (— 2020)
End of RCC: —/23 (— 2023)
End of Project: —/24 (— 2024)
Country: Turkey
River: Uzun Creek
DMS Co-ordinates: 40˚29'53"N, 41˚35'36"E
DD Co-ordinates: 40.498055, 41.593334
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|