Site visit to Lai Chau for a review of placement procedures during the heavy rain of the… View More
Site Visit
Post 11 to 20 of 31
Site visit to Shahpurkandi dam site for the Trial Mix Programme for the air entrained RCC (and… View More
Review of the results of the Stage-1 and Stage-2 Trial Mix… View More
A visit was made to Muskrat Falls from 31 October to 23 November in order to supervise the Stage-1 Trial Mix Programme for the North Dam and to help with the review of the Bids submitted for the construction of the North and South… View More
A visit was made to the Lai Chau site between 18 January and 1 February to review the progress of the construction of the dam. In addition, KfW – the German Government-owned Development Bank – also visited the site to learn about RCC dam… View More
A visit was made to St John's to discuss the long-term results from the Stage-1 Trial Mix Programme and the plans for the construction of the North dam at Muskrat… View More
A visit was made to Nay Pyi Taw to supervise the Stage-3 Trial Mix Programme for the Shwe Li 3 dam, with a new granite aggregate produced on… View More
A visit was made to Turkey to inspect the Zetes-2 Thermal Power Station to investigate their flyash as a potential material for Muskrat Falls North… View More
A visit was made to Muskrat Falls to discuss the use of the flyash from Zetes-2 and the construction methodology proposed by the Contractor for the North Dam. There was still significant ice in the lake below the Falls even at the beginning of… View More
A visit was made to St John's to further discuss the construction methodology proposed by the Contractor and the lessons learned from previous RCC dams using slip-formed facing elements (e.g. Upper… View More