Dam Search Results
- Purposes: Water Supply
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Shimajigawa | Japan | F I W | Shimaji | 21 | 09/76 | 10/78 | 04/80 | 03/81 | 89 | 240 | 165 | 317 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 to 200 | 500 700 | 84 | 36 | (F) | |
Copperfield | Australia | W | Copperfield | 20 | 12/83 | 05/84 | 09/84 | 09/84 | 40 | 340 | 140 | 156 | V | (3) | V 0.90 | (3) (17) | 0.80 | (1) | 300 | 300 | 80 | 30 | (F) | |
Middle Fork | USA | F W | Middle Fork | 1 | 05/84 | 07/84 | 09/84 | 11/84 | 38 | 125 | 42 | 43 | V | (1) | 0.80 | (1)* | conduit | 300 | 300 | 66 | 0 | (-) - | ||
Carroll E. Ecton - formerly Winchester | USA | W | Upper Howard Creek | 2 | 06/84 | 08/84 | 11/84 | 01/85 | 23 | 363 | 24 | 27 | V | (6) | V 1.00 | (5) (17) | 1.00 | (1) | 300 | 300 | 104 | 0 | (-) - | |
Galesville | USA | F I R W | Cow Creek | 52 | 07/84 | 05/85 | 08/85 | 10/85 | 50 | 290 | 161 | 171 | V | (1) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 53 | 51 | (F) | |
Castilblanco de los Arroyos | Spain | W | Cala | 1 | 07/84 | 05/85 | 10/85 | 12/85 | 25 | 124 | 14 | 20 | V | (1) | V 0.75 | (1) (1) | 0.75 | (1) | 450 | 450 | 72 61 | 116 120 | (F) | |
Kengkou | China | H W | Youxi | 27 | 11/84 | 11/85 | 04/86 | 11/86 | 57 | 123 | 43 | 62 | V | (9) | 0.75 | (10) | 0.75 | (13) | 250 & 500 | 250 & 500 | 60 60 | 120 80 | (F) | |
Craigbourne | Australia | I W | Coal | 13 | 01/86 | 04/86 | 06/86 | 08/86 | 25 | 247 | 22 | 24 | V | (7) | 1.00 | (17) | separate | 300 | 300 | 70 | 60 | (F) | ||
Tamagawa | Japan | F H I W | Tama | 254 | 08/80 | 09/83 | 07/86 | 12/90 | 100 | 441 | 772 | 1150 | V 0.60 | (1) (1) | 0.81 | (1) | 0.81 | (1) | 150 - 200 | 750 1000 | 91 | 39 | (F) | |
Grindstone Canyon | USA | W | Grindstone | 2 | 09/85 | 05/86 | 07/86 | 10/86 | 42 | 432 | 88 | 96 | V | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 76 | 0 | (-) - | |
Monksville | USA | W | Wanaque | 27 | 05/85 | 03/86 | 08/86 | 11/86 | 48 | 670 | 219 | 232 | V | (1) | V 0.78 | (1) (17) | 0.78 | (1)* | 300 | 300 | 64 | 0 | (-) - | |
De Mist Kraal | South Africa | I W | Little Fish | 4 | 09/84 | 05/86 | 08/86 | 10/87 | 30 | 300 | 35 | 65 | V | (1) | 0.60 | (1)* | 0.60 | (1)* | 250 | 250 | 58 | 58 | (F) | |
Saco de Nova Olinda | Brazil | F I W | Gravata | 97 | 07/85 | 07/86 | 10/86 | 06/87 | 56 | 230 | 132 | 143 | V | (1) | 0.80 | (3)* | separate | 400 | 400 | 55 | 15 | (N) | ||
Flag Boshielo - formerly Arabie | South Africa | I W | Olifants | 104 | 09/85 | 03/86 | 11/86 | 07/87 | 36 | 455 | 101 | 142 | V | (1) | 0.50 0.75 | (1)* (1)* | 0.75 | (1) | 300 | 300 | 36 | 74 | (S) | |
Zaaihoek | South Africa | W | Slang | 190 | 05/85 | 11/85 | 03/87 | 09/88 | 47 | 527 | 97 | 134 | V | (1) | V 0.62 | (1)* | 0.62 | (1)* | 250 | 250 | 36 | 84 | (S) | |
Upper Stillwater | USA | I W | Rock Creek | 37 | 12/83 | 09/85 | 08/87 | 12/87 | 91 | 815 | 1125 | 1281 | V | (14) | 0.32 0.60 | (14) (14) | 0.32 0.60 | (14)* (14)* | 300 | 300 | 79 | 173 | (F) | |
Los Morales | Spain | W | Morales | 2 | 06/86 | 02/87 | 10/87 | 12/87 | 28 | 200 | 22 | 26 | V | (1) (3) | 0.75 | (3)* | 0.75 | (1) | 300 - 400 | 300 - 400 | 80 74 | 140 128 | (F) | |
Mano | Japan | F H W | Mano | 36 | 12/83 | 04/85 | 01/88 | 03/90 | 69 | 239 | 104 | 219 | V | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) | |
Stagecoach | USA | H I R W | Yampa | 42 | 08/87 | 06/88 | 07/88 | 11/88 | 46 | 116 | 34 | 39 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 71 | 71 | (F) | |
Nunome | Japan | F W | Nunome | 17 | 05/86 | 01/88 | 10/88 | 12/89 | 72 | 322 | 110 | 330 | V 0.40 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 78 | 42 | (F) | |
Knellpoort [A-G] | South Africa | W | Rietspruit | 137 | 04/88 | 05/88 | 11/88 | 09/89 | 50 | 200 | 45 | 59 | V | (1) | 0.60 | (1)* | 0.60 | (1)* | 250 | 250 | 61 | 142 | (F) | |
Los Canchales | Spain | F W | Lácara | 15 | 05/88 | 07/88 | 11/88 | 01/89 | 32 | 240 | 25 | 54 | V | (3) | 0.50 0.80 | (3)* (3)* | 0.50 | (1)* | 250 | 250 | 84 70 | 156 145 | (F) | |
Yuxi [A] | China | W | Yuxi | 1 | - /85 | - /87 | - /88 | - /89 | 38 | 102 | (F) | |||||||||||||
S.W. Freese (formerly Stacy - spillway) | USA | W | Colorado | 700 | 05/87 | 05/88 | 04/89 | 01/90 | 31 | 173 | 89 | 158 | V | (13) | 0.831 | (17) | ogee | (12) | 300 | 300 | 125 | 62 | (C) | |
Longmentan Nº1 | China | H I W | Chanxi | 53 | 12/85 | 12/87 | 08/89 | 09/89 | 58 | 150 | 71 | 93 | V 0.30 | (12) (12) | 0.75 | (10) | 0.75 | (13) | 300 | 300 | 72 54 | 82 86 | (F) | |
Wolwedans [A-G] | South Africa | W | Great Brak | 24 | 11/87 | 10/88 | 10/89 | 11/90 | 70 | 268 | 180 | 210 | V | (1) | 0.50 | (1)* | 0.50 | (1)* | 250 | 250 | 58 | 136 | (F) | |
Dodairagawa | Japan | F W | Kabura | 5 | 03/86 | 06/88 | 01/90 | 03/92 | 70 | 300 | 167 | 350 | V 0.40 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 180 | 500 | 96 | 24 | (F) | |
Quail Creek South | USA | W | Quail Creek | 50 | 02/90 | 03/90 | 05/90 | 08/90 | 42 | 610 | 130 | 150 | V | (1) | V 0.85 | (1) (17) | conduit | 300 | 300 | 80 | 53 | (F) | ||
Concepción | Honduras | W | Concepción | 35 | 12/88 | 12/89 | 06/90 | 08/90 | 68 | 694 | 270 | 290 | 0.075 | (2) | 0.80 | (3)* | 0.80 | (1)* | 400 | 400 | 65 | 15 | (N) | |
Wriggleswade | South Africa | W | Kubusie | 94 | 07/88 | 07/89 | 07/90 | 12/90 | 34 | 737 | 134 | 165 | V | (1) | V 0.62 | (1)* | 0.62 | (1)* | 250 | 250 | 44 | 66 | (F) | |
Maroño | Spain | W | Izoria and Idas | 2 | 01/89 | 11/89 | 08/90 | 11/91 | 53 | 182 | 80 | 91 | 0.05 | (3) | V 0.75 | (3)* (3)* | 0.75 | (1)* | 300 | 300 | 80 65 | 160 170 | (F) | |
Asari | Japan | F W | Asari | 9 | 07/86 | 10/87 | 09/90 | 03/93 | 74 | 390 | 259 | 517 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) | |
Hervás | Spain | W | Hervás | 1 | 01/89 | 03/90 | 09/90 | 10/90 | 33 | 210 | 24 | 43 | 0.15 | (1) | 0.70 | (1)* (5)* | 0.70 | (1) | 300 | 300 | 80 | 155 | (F) | |
Kamuro | Japan | F W | Kaneyama | 7 | 07/86 | 07/88 | 10/90 | 08/93 | 61 | 257 | 136 | 307 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 500 | 96 | 24 | (F) | |
Glen Melville | South Africa | W | Ecca | 7 | 02/88 | 04/89 | 12/90 | 04/91 | 32 | 380 | 66 | 114 | V | (1) | V 0.75 | (1) (1)* | 0.75 | (1)* | 330 | 330 | 65 | 65 | (F) | |
Gameleiras | Brazil | F I R W | Gameleiras | 145 | 07/90 | 12/90 | 04/91 | 05/91 | 29 | 150 | 27 | 29 | V | (1) | (1)* | 400 | 400 | 52 | 13 | (-) - | ||||
Sakaigawa | Japan | F H I W | Sakai | 60 | 03/85 | - /87 | 07/91 | 01/93 | 115 | 298 | 373 | 713 | V 0.80 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 180 | 750 | 84 | 36 | (F) | |
New Victoria | Australia | W | Munday Brook | 10 | 08/90 | 03/91 | 08/91 | 11/91 | 52 | 285 | 121 | 135 | V | (14) | 0.325 0.80 | (14)* (14)* | 0.325 0.80 | (14)* (14)* | 300 | 300 | 79 | 160 | (F) | |
Burguillos del Cerro | Spain | W | Ribera de los Montes | 3 | 12/90 | 05/91 | 09/91 | 12/91 | 24 | 167 | 25 | 33 | V | (14) | 0.13 0.60 | (14)* | 0.60 | (13)* | 300 | 300 | 80 | 135 | (F) | |
Choldocogagna | France | W | Lessarte | 1 | 04/91 | 07/91 | 10/91 | 12/91 | 36 | 100 | 19 | 23 | 0.10 | (1) | 0.75 | (16) | 0.75 | (1)* | 300 | 300 | 110 | (R) | ||
Alan Henry Spillway | USA | W | Double Mountain Fork | 140 | 03/91 | 12/91 | 04/92 | - /93 | 25 | 84 | 22 | 23 | V | (13) | 1.10 | (17) | ogee | (1) | 300 | 300 | 119 | 59 | (F) | |
Urdalur | Spain | W | Alzania | 5 | 03/90 | 08/91 | 07/92 | 10/92 | 58 | 396 | 150 | 240 | V | (1) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 72 | 108 | (F) | |
Christian E. Siegrist | USA | W | Mill | 4 | 09/91 | 04/92 | 07/92 | - /93 | 40 | 213 | 69 | 70 | V | (6) | 0.80 | (17) | 0.80 | (1) | 300 | 300 | 59 | 34 | (F) | |
Taung | South Africa | I W | Harts | 66 | 06/90 | 08/91 | 09/92 | 05/93 | 50 | 320 | 132 | 153 | V | (1) | V 0.75 | (1) (1)* | 0.75 | (1)* | 250 | 250 | 44 | 66 | (F) | |
Arriarán | Spain | W | Arriarán | 3 | 10/91 | 04/92 | 09/92 | 02/94 | 58 | 206 | 110 | 113 | 0.05 | (3) | 0.70 | (3)* | 0.70 | (3)* | 300 | 300 | 85 | 135 | (F) | |
Burton Gorge | Australia | W | Isaac | 20 | 07/92 | 09/92 | 11/92 | 12/92 | 26 | 285 | 64 | 68 | V 1.00 | (8) (17) | 0.80 1.00 | (3)* (17) | 0.80 | (13)* | 300 | 300 | 85 | 0 | (-) - | |
Ryumon | Japan | F I W | Sakoma | 42 | 09/87 | 03/90 | 11/92 | 03/97 | 100 | 378 | 521 | 836 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 - 200 | 750 - 1000 | 91 | 39 | (F) | |
Joumoua | Morocco | W | Joumoua | 7 | 07/89 | 06/90 | 11/92 | 12/92 | 57 | 250 | 150 | 200 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 350 | 350 | 105 180 | 45 0 | (-) - | |
Hattabara | Japan | F W | Ashida | 60 | 08/88 | - /89 | - /92 | 03/98 | 85 | 325 | 228 | 500 | V 0.20 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 750 | 84 | 36 | (F) | |
Puding [A] | China | H I W | Sanchahe | 377 | 03/89 | 06/92 | 05/93 | 02/94 | 75 | 196 | 103 | 137 | V | (1) | 0.35 | (1) | ogee 0.35 | (1) (1) | 300 | 300 | 85 54 | 103 99 | (F) | |
Tsugawa | Japan | F H W | Kamo | 6 | 10/89 | 10/91 | 07/93 | 03/94 | 76 | 228 | 222 | 342 | V 0.60 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) | |
Clifford D. Craig (formerly Spring Hollow) | USA | W | off-stream | 12 | 10/92 | 03/93 | 08/93 | - /94 | 74 | 302 | 222 | 223 | V | (6) | 0.80 | (17) | none | 300 | 300 | 53 | 53 | (F) | ||
Hudson River Nº11 | USA | W | Mountain Creek | 11/92 | 04/93 | 08/93 | - /93 | 21 | 168 | 26 | 28 | V | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 119 | 84 | (F) | ||
Kodama | Japan | F W | Kodama | 14 | 10/89 | 05/91 | 12/93 | 03/97 | 102 | 280 | 358 | 570 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 36 | (S) | |
Miyatoko | Japan | F W | Miyatoko | 5 | 06/89 | 06/90 | 12/93 | 01/97 | 48 | 256 | 172 | 280 | 0.60 | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) | |
Daguangba | China | H I W | Changhuajiang | 1710 | 06/90 | 12/91 | 12/93 | 07/95 | 55 | 827 | 485 | 860 | V | (1) | 0.75 | (10) (3) | 0.75 | (1) | 300 | 300 | 55 | 96 | (F) | |
Sahla | Morocco | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) | |
Pelo Sinal | Brazil | W | Taperobá | 76 | 12/91 | - /92 | - /93 | - /94 | 34 | 296 | 69 | 89 | (1) | 300 | 300 | 64 | 16 | (-) - | ||||||
Shanzi | China | F H I W | Aojiang | 172 | 08/92 | 11/93 | 05/94 | 06/95 | 66 | 274 | 180 | 272 | V | (5) | 0.80 | (10) | 0.77 | (13) | 300 | 300 | 65 55 | 125 95 | (F) | |
San Lazaro | Mexico | F G W | San Lazaro | 11 | 10/85 | 04/94 | 06/94 | 07/94 | 37 | 176 | 35 | 53 | V 0.20 | (5) | 0.80 | (3)* | 0.80 | (13) | 300 | 300 | 100 90 | 220 220 | (M) | |
Wenquanbao [A] | China | F H I W | Tanghe | 7 | 10/91 | 10/92 | 06/94 | - /95 | 48 | 188 | 55 | 63 | V | (4) | 0.30 | (3) | ogee | (13) | 300 | 300 | 110 69 | 68 85 | (F) | |
Várzea Grande | Brazil | W | Picuí | 21 | 10/93 | 10/94 | 10/94 | - /95 | 31 | 135 | 27 | 28 | (1) | (3)* | 300 | 300 | 56 | 14 | (N) | |||||
Cova da Mandioca | Brazil | I W | Cova da Mandioca | 126 | 01/93 | 09/93 | 12/94 | 12/94 | 26 | 360 | 75 | 79 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 400 | 400 | 64 | 16 | (-) - | |
Rio da Prata | Brazil | W | Da Prata | 42 | - /92 | 09/93 | 12/94 | - /95 | 26 | 405 | 61 | 75 | 300 | 300 | 80 | 0 | (-) - | |||||||
Miyagase | Japan | F H W | Nakatsu | 193 | 11/87 | 11/91 | 02/95 | 03/01 | 156 | 400 | 1537 | 2060 | 0.20 0.60 | (1) (1) | 0.625 | (1) | 0.625 | (1) | 150 - 200 | 750 | 91 | 39 | (F) | |
Yoshida | Japan | F W | Yoshida | 2 | 07/91 | 07/93 | 02/95 | 03/96 | 75 | 218 | 265 | 304 | V | (1) | 0.75 | (1) | 0.75 | (1) | 250 | 750 | 84 | 36 | (F) | |
Chiya | Japan | F H W | Takahashi | 28 | 03/89 | 09/92 | 04/95 | 03/98 | 98 | 259 | 396 | 670 | V | (1) | 0.77 | (1) | 0.77 | (1) | 250 | 750 | 91 | 39 | (F) | |
Canoas | Brazil | W | Saõ Gonçalo | 69 | 07/93 | 08/94 | 05/95 | - /96 | 51 | 116 | 87 | 93 | 0.10 | (1) | 0.80 | (10)* | 0.80 | (1)* | 300 | 300 | 64 | 16 | (N) | |
Ohmatsugawa | Japan | F H W | Matsu | 12 | 07/90 | 10/92 | 06/95 | 09/96 | 65 | 296 | 141 | 294 | V 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 39 | (F) | |
Xibingxi [A-G] | China | H W | Longshanxi | 9 | 08/93 | 12/94 | 07/95 | 10/95 | 64 | 93 | 25 | 33 | V 0.08 | (4) (4) | 0.65 | (3) | ogee 0.65 | (13) | 300 - 350 | 300 - 350 | 80 79 | 120 105 | (F) | |
Guanyinge (Kwan-in-Temple) | China | F H I W | Taizi | 2168 | 05/90 | 09/91 | 09/95 | 10/95 | 82 | 1040 | 1240 | 1876 | V 0.10 | (1) (1) | 0.70 | (1) | 0.70 | (1) | 270 - 280 | 750 | 91 | 39 | (F) | |
Satsunaigawa | Japan | F H I W | Satsunai | 54 | 02/87 | 04/91 | 10/95 | 03/99 | 114 | 300 | 536 | 770 | 0.40 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 78 | 42 | (S) | |
Enjil | Morocco | I W | Taghoucht | 12 | 11/93 | 03/94 | 10/95 | 03/96 | 36 | 80 | 45 | 57 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 110 150 | 0 0 | (N) | |
New Peterson Lake | USA | W | Tributary of Cache La Poudre | 3 | 05/95 | 09/95 | 11/95 | 12/95 | 21 | 70 | 7 | 8 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 145 | 48 | (F) | |
Shiokawa | Japan | F I W | Shio | 12 | 05/93 | 08/93 | 11/95 | 03/99 | 79 | 225 | 299 | 388 | 0.10 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) | |
Urayama | Japan | F H W | Urayama | 58 | 03/90 | 12/92 | 12/95 | 03/99 | 156 | 372 | 1294 | 1750 | V 0.65 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) | |
Shimantan | China | F I W | Gunhe | 120 | 07/93 | 04/94 | 12/95 | 07/96 | 41 | 650 | 272 | 351 | V | (3') | 0.75 | (3)* | 0.75 | (1) | 300 | 300 | 98 51 | 98 107 | (F) | |
Acauã | Brazil | F I W | Paraíba | 247 | - /93 | - /93 | - /95 | - /95 | 79 | 674 | 674 | 734 | (1) | (3)* | (1)* | 300 | 300 | 64 | 16 | (N) | ||||
Passagem de Trairas | Brazil | R W | Seridó | 50 | - /93 | - /94 | - /95 | - /96 | 26 | 458 | 27 | 28 | 64 | 16 | (N) | |||||||||
Nacaome | Honduras | W | Rio Grande Nacaome | 42 | 06/93 | 08/94 | - /95 | - /95 | 54 | 320 | 250 | 300 | 0.15 | (2) | 0.80 | (3)* | 0.80 | (12)* | 400 | 400 | 64 | 21 | (N) | |
Shimagawa | Japan | F W | Shima | 9 | 03/91 | - /94 | 05/96 | 03/98 | 90 | 330 | 390 | 516 | V 0.50 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) | |
Jack Turner (formerly Big Haynes) | USA | W | Big Haynes Creek | 10/94 | 02/95 | 06/96 | 09/96 | 27 | 427 | 72 | 74 | V | (8) | 0.80 | (10)* | 0.80 | (10)* | 300 | 300 | 42 39 | 42 39 | (F) | ||
Hiyoshi | Japan | F H W | Katsura | 66 | - /83 | 10/94 | 07/96 | 03/98 | 70 | 438 | 440 | 670 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 77 | 36 33 | (F) | |
Tomisato | Japan | F I W | Douzan | 53 | 02/92 | - /95 | 02/97 | 03/00 | 111 | 250 | 355 | 510 | V | (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 1000 | 84 72 | 36 48 | (F) | |
Wanyao | China | F H I W | Dahexi | 223 | 10/93 | 01/95 | 05/97 | 07/97 | 83 | 390 | 320 | 458 | V 0.20 | (1) (1) | 0.70 | (5) | 0.75 | (13) | 300 | 300 | 64 | 96 | (F) | |
Takisato | Japan | F H I W | Sorachi | 108 | 10/90 | - /93 | 07/97 | 06/00 | 50 | 445 | 327 | 455 | 0.06 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) | |
Tie Hack | USA | W | South Fork Clear Creek | 3 | 05/96 | 10/96 | 08/97 | - /97 | 41 | 170 | 62 | 69 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 89 | 83 | (F) | |
Shuangxi | China | F H I W | Meixihe | 95 | 01/95 | 03/96 | 10/97 | 12/97 | 60 | 221 | 113 | 172 | V | (9) | 0.80 | (1) | 0.78 | (1) | 300 | 300 | 90 55 | 110 105 | (F) | |
Cadiangullong | Australia | W | Cadiangullong Creek | 4 | 11/96 | 05/97 | 12/97 | 03/98 | 43 | 356 | 114 | 123 | V | (3') | 0.75 | (1)* (3')* | 0.75 | (1)* | 300 | 300 | 90 | 90 | (F) | |
Taolinkou | China | F H I R W | Qinglonghe | 859 | 11/92 | 12/94 | 12/97 | - /98 | 75 | 500 | 585 | 1350 | V 0.15 | (1) | 0.78 | (1) | ogee 0.65 | (1) (1) | 300 | 300 | 135 70 | 70 85 | (F) | |
Santa Clara-GO | Brazil | W | 129 | - /86 | - /95 | - /97 | - /97 | 47 | 129 | |||||||||||||||
Pedro Moura Junior (formerly Belo Jardim) | Brazil | W | Ipojuca (Gravata) | 37 | 05/95 | 09/96 | - /97 | - /98 | 56 | 380 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | ||||
Bouhouda | Morocco | I W | Sraa | 56 | 05/95 | 04/96 | 05/98 | 09/98 | 55 | 174 | 165 | 186 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 120 | 0 0 | (N) | |
Hayachine | Japan | F H I W | Hienuki | 17 | 03/93 | 10/95 | 06/98 | 03/00 | 74 | 333 | 141 | 333 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 84 | 36 | (F) | |
Val da Serra | Brazil | W | Ibicui-Mirim | 24 | 07/97 | 11/97 | 07/98 | 11/98 | 37 | 675 | 69 | 95 | V | (13) | (12)* | (12)* | 300 | 300 | 90 | 30 | (F) | |||
Gassan | Japan | F H I W | Bonji | 65 | 08/88 | 06/94 | 10/98 | 03/01 | 123 | 393 | 731 | 1160 | V | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) | |
Penn Forest | USA | W | Wild Creek | 2 | 08/96 | 09/97 | 10/98 | 12/98 | 49 | 610 | 283 | 283 | V | (6) | 0.50 | (15) (7) | conduit | 300 | 300 | 58 | 41 | (F) | ||
Yongxi Nº3 | China | F H W | Dazhangxi | 68 | 05/96 | 10/97 | 10/98 | 09/99 | 87 | 198 | 170 | 255 | V | (3') | 0.73 | (10) | ogee 0.73 | (1) (1) | 280 | 3000 | 115 80 | 95 90 | (F) | |
Jucazinho | Brazil | F I R W | Capiibaribe | 327 | 07/96 | 11/96 | 10/98 | - /99 | 63 | 442 | 442 | 470 | V | (12) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 64 | 16 | (N) | |
Rialb | Spain | I W | Segre | 402 | 01/93 | 10/95 | 12/98 | 01/00 | 99 | 630 | 980 | 1016 | 0.15 0.35 | (1) (1) | 0.40 0.65 | (1) (1) | 0.65 | (1) | 330 | 330 | 70 65 | 130 130 | (F) | |
Changshun | China | H W | Yujiang | 68 | - /91 | 03/97 | 12/98 | 06/00 | 69 | 279 | 170 | 200 | V | (3') | 0.74 | (3) | 0.80 | (1) | 300 | 5000 | 134 72 | 89 48 | (F) | |
Bab Louta | Morocco | W | Bous Sbaa | 37 | 01/97 | 02/98 | 02/99 | 03/99 | 54 | 110 | 63 | 77 | V | (5) | 0.75 | (1)* | 0.75 | (13) | 300 | 300 | 65 80 | 15 20 | (N) | |
Fenhe Nº2 | China | F H W | Fenhe | 130 | 11/96 | 08/98 | 03/99 | 06/00 | 87 | 350 | 362 | 448 | V 0.20 | (1) (1) | 0.75 | (5) | 0.75 | (1) | 300 | 3000 | 127 60 | 84 93 | (F) | |
Jiangya | China | F H I N W | Loushui | 1741 | 07/95 | 10/96 | 04/99 | - /01 | 131 | 368 | 1100 | 1310 | V | (3') | 0.80 | (3)* | ogee 0.80 | (13) | 300 | 3000 | 87 64 46 | 107 96 107 | (F) | |
Buckhorn | USA | W | Contentea Creek | 03/98 | - /98 | 04/99 | 06/09 | 16 | 781 | 64 | 69 | V | (6) | 300 | 300 | 89 | 0 | (-) - | ||||||
Songyue (1st Stage) | China | F H I R W | Hailanhe | 21 | 09/97 | 01/98 | 04/99 | 09/99 | 29 | 271 | 44 | 77 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | ||
Toker | Eritrea | W | Toker | 14 | 11/96 | 02/98 | 05/99 | 08/99 | 73 | 263 | 187 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (12)* | 330 | 330 | 110 | 85 | (F) | |
Bertarello | Brazil | W | Arroio Burati | 6 | - /98 | 08/98 | 07/99 | - /00 | 29 | 219 | 80 | 115 | V | (13) | (12)* | (12)* | 300 | 300 | 72 | 18 | (N) | |||
Ziga | Burkina Faso | W | Nakambe | 28 | 04/98 | 10/98 | 08/99 | 07/00 | 18 | 120 | 44 | V | (1) | 0.80 | (10)* | 0.80 | (12)* | 300 | 300 | (-) - | ||||
Baishi | China | F H I W | Dalinghe | 1645 | 09/96 | 04/97 | 09/99 | 12/00 | 49 | 513 | 111 | 603 | V 0.10 | (1) (1) | 0.70 | (1) | 0.76 | (1) | 300 | 300 | 72 | 58 | (F) | |
Hongpo [A-G] | China | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) | |
Ponto Novo | Brazil | I W | Itapicuru-açu | 39 | 05/98 | 07/98 | 12/99 | 02/00 | 26 | 266 | 90 | 105 | (1) | (3)* | (1) | 300 | 300 | 72 | 18 | (N) | ||||
Kubusugawa | Japan | F H I W | Kubusu | 10 | 03/93 | 04/98 | - /99 | 10/02 | 95 | 253 | 364 | 469 | V 0.40 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) | |
Ohnagami | Japan | F I W | Sutu | 19 | 03/93 | 04/98 | 04/00 | 03/03 | 72 | 334 | 284 | 362 | V 0.25 | (1) (1) | 0.79 | (1) | 0.79 | (1) | 250 | 750 | 84 | 36 | (F) | |
Pickle Jar | USA | W | 1 | 10/99 | 03/00 | 05/00 | 08/00 | 16 | 57 | 331 | 331 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 90 | 0 | (-) - | ||
Beni Haroun | Algeria | I W | El Kebir | 963 | 01/93 | 10/98 | 07/00 | 12/00 | 118 | 714 | 1690 | 1900 | V | (1) | 0.80 | (1)* | 0.80 | (13) | 300 | 300 | 82 | 143 | (F) | |
Inyaka | South Africa | W | Marite | 123 | 01/96 | 06/97 | 10/00 | 03/02 | 53 | 350 | 160 | 327 | V | (1) | 0.68 | (1) | 0.68 | (1) | 250 | 250 | 60 | 120 | (F) | |
Santa Cruz do Apodi | Brazil | F I R W | Apodi | 600 | - /98 | - /99 | - /00 | - /01 | 58 | 1660 | 1023 | 1120 | 300 | 300 | 80 | 0 | (-) - | |||||||
Tiúma | Brazil | W | Tiúma | 6 | - /99 | - /00 | 01/01 | 05/01 | 16 | 290 | ||||||||||||||
Shimenzi [A] | China | H I W | Taxi | 80 | 06/98 | 06/99 | 06/01 | 10/01 | 110 | 176 | 188 | 211 | 0.142 V | (3') (3') | V 0.18 | (3) (3) | crest | (12) | 300 | 3000 | 93 62 | 110 110 | (F) | |
North Fork Hughes River | USA | F R W | North Fork Hughes River | 1480 | 07/99 | 03/01 | 07/01 | - /01 | 26 | 200 | 65 | 65 | V | (8) | 0.80 | (10) | 0.80 | (1) | 300 | 300 | 59 107 | 59 65 | (F) | |
Chubetsu | Japan | F H I W | Chubetu | 93 | 03/94 | 09/97 | 08/01 | 03/04 | 86 | 290 | 523 | 1007 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 | 36 | (F) | |
Mianhuatan | China | F H N W | Ting | 2035 | 04/98 | 12/98 | 11/01 | 04/02 | 111 | 302 | 500 | 615 | V | (9) | 0.75 | (10) | 0.70 | (13) | 300 | 3000 | 82 59 48 | 100 88 88 | (F) | |
Fukuchiyama | Japan | F N W | Fukuti | 3 | 10/98 | - /99 | 12/01 | 03/03 | 65 | 255 | 115 | 201 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) | |
Castanhão | Brazil | F I R W | Congonhas | 800 | 10/99 | - /00 | 12/01 | - /02 | 85 | 668 | 890 | 1030 | 300 | 300 | 85 | 0 | (-) - | |||||||
Yanwangbizi | China | F H I W | Dalinghe | 217 | - /96 | - /97 | - /01 | - /02 | 35 | 383 | 87 | 220 | 64 | 118 | (F) | |||||||||
Umari | Brazil | F I R W | do Carmo | 293 | - /98 | - /99 | - /01 | - /01 | 42 | 2308 | 655 | 660 | (12) | 300 | 300 | 70 | 0 | (-) - | ||||||
Yushi | China | F I W | Biliuhe | 89 | - /98 | - /99 | - /01 | - /02 | 50 | 267 | 218 | 233 | 70 | 70 | (F) | |||||||||
Pedras Altas | Brazil | F I R W | Itapicuru | - /00 | - /00 | - /01 | - /01 | 24 | 1090 | 42 | 60 | 300 | 300 | 34 | 41 | (-) - | ||||||||
Pirapama | Brazil | W | Pirapama | 61 | - /00 | - /00 | - /01 | - /01 | 25 | 300 | 87 | 137 | (1) | 300 | 300 | 72 | 18 | (-) - | ||||||
Estreito | Brazil | F I R W | Curimatá | 24 | - /97 | - /00 | - /01 | 11/02 | 26 | 300 | 12 | 14 | 300 | 300 | 64 | 16 | (N) | |||||||
Helong | China | H R W | Hailanhe | 30 | 11/98 | 08/99 | 01/02 | 12/02 | 30 | 244 | 43 | 89 | V | (1) | 0.75 | (10) | ogee | (10)* | 300 | 2000 | 113 | 113 | (F) | |
Hunting Run | USA | W | Hunting Run | 2 | 05/00 | 02/01 | 01/02 | 08/02 | 36 | 720 | 115 | 128 | V | (8) | (17) | (17) | 300 | 300 | 74 | 37 | (F) | |||
Camará | Brazil | W | Riachäo | 27 | 05/00 | 09/01 | 06/02 | - /02 | 56 | 296 | V | (1) | 0.80 | (1) | 300 | 300 | 80 | 0 | (-) - | |||||
Kutani | Japan | F W | Daishoji | 25 | 12/96 | 04/00 | 07/02 | 03/06 | 76 | 280 | 188 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) | |
Randleman Lake | USA | R W | Deep | 84 | 07/01 | 04/02 | 07/02 | 01/03 | 31 | 280 | 70 | 76 | V | (1) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 89 | 104 | (F) | |
Xiao Yangxi (and saddle dam) | China | W | Xia Oyangxi | 15 | 05/01 | 01/02 | 10/02 | 12/02 | 45 | 118 | 47 | 49 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 350 | 3500 | 138 60 | 113 90 | (F) | |
Olivenhain | USA | W | Escondido Creek | 30 | 06/01 | 02/02 | 10/02 | 07/03 | 97 | 788 | 1070 | 1140 | V | (4') | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 74 | 121 | (F) | |
Carnaúba | Brazil | I W | Quixeré | 26 | - /01 | 02/02 | 11/02 | - /03 | 19 | 700 | 300 | 300 | 100 | 0 | (-) - | |||||||||
Koyama | Japan | F I W | Ohkita | 17 | 11/94 | 05/00 | 12/02 | 03/05 | 65 | 462 | 270 | 531 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (S) | |
Ribeirão Riacho Pasto Velho | Brazil | I W | Pasto Velho | 11 | - /00 | - /01 | - /02 | - /03 | 27 | 0 | ||||||||||||||
Xiaoyangxi | China | W | Xiaoyangxi | 15 | - /00 | - /01 | - /02 | - /03 | 45 | 118 | 49 | |||||||||||||
Mujib | Jordan | I W | Mujib | 35 | 01/99 | 01/01 | 02/03 | 11/03 | 67 | 490 | 654 | 694 | 0.10 | (2) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 85 | 0 | (-) - | |
Ahl Souss (Ait M’Zal) | Morocco | I W | Izig | 5 | 11/01 | 01/03 | 05/03 | 01/04 | 49 | 222 | 50 | 27 | 0.20 | (1) | 0.80 | (1)* | 0.85 | (12) | 300 | 300 | 80 100 | 0 0 | (-) - | |
Takizawa | Japan | F N W | Nakatu | 63 | 03/99 | 10/01 | 06/03 | 03/07 | 139 | 424 | 810 | 1670 | 0.15 0.70 | (1) (1) | 0.72 | (1) | 0.72 | (1) | 250 | 1000 | 84 72 | 36 48 | (F) | |
Nandoni (formerly Mutoti) | South Africa | I W | Luvuvhu | 164 | 04/98 | 12/99 | 08/03 | 04/04 | 47 | 392 | 150 | 316 | V | (1) | 0.75 | (1) | 0.75 | (1)* | 250 | 250 | 54 | 129 | (F) | |
Shanggou [A] | China | W | Yangshui | 1 | - /01 | - /02 | - /03 | - /04 | 39 | 176 | ||||||||||||||
Hassan II (formerly Sidi Said) | Morocco | F I W | Moulouya | 400 | 02/01 | 03/03 | 04/04 | 03/05 | 115 | 577 | 590 | 690 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 80 | 15 20 | (N) | |
Tamesna (formerly Boukerkour) | Morocco | F I W | Zamrine | 56 | 05/03 | 04/04 | 09/04 | 05/05 | 66 | 220 | 190 | 215 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 | 0 | (N) | |
João Leite | Brazil | W | João Leite | 129 | 03/01 | 01/03 | - /04 | - /04 | 55 | 380 | 270 | 290 | 300 | 300 | 80 | 20 | (N) | |||||||
Yujianhe [A] | China | F I W | Wu | 11 | - /02 | - /03 | - /04 | - /05 | 81 | 180 | 105 | 110 | 0.10 | 0.76 | 0.76 | |||||||||
Pindobaçu | Brazil | I W | Itapicuru-aço | 17 | - /01 | - /03 | - /04 | - /05 | 45 | 191 | 75 | 85 | 300 | 300 | 56 | 14 | (N) | |||||||
Bandeira de Melo | Brazil | I W | Paraguaçu | 112 | - /02 | 09/03 | - /04 | - /05 | 19 | 320 | 75 | 85 | (1) | (1)* | (1)* | 300 | 300 | 56 | 14 | (N) | ||||
Big Cherry | USA | W | South Fork, Powell River | 2 | 04/04 | 09/04 | 01/05 | 07/05 | 26 | 113 | 11 | 12 | 300 | 300 | 82 | 82 | (F) | |||||||
Jahgin | Iran | F I W | Jahgin | 300 | 12/01 | 05/04 | 05/05 | 09/07 | 78 | 220 | 232 | 382 | V 0.30 | (3') (3')* | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 105 160 | 90 90 | (N) | |
Zhaolaihe [A] | China | H I W | Sidu | 70 | 12/03 | 03/04 | 05/05 | 10/05 | 107 | 206 | 166 | 255 | curve | (3') | curve | (3') | (3') | 300 | 3000 | 84 126 | 126 103 | (F) | ||
Suofengying | China | F H I N W | Wu | 201 | 10/00 | 06/03 | 08/05 | 03/06 | 122 | 165 | 421 | 739 | V 0.25 | (3') (3') | 0.70 | (3') | 0.70 | (1) | 300 | 3000 | 64 | 95 | (F) | |
Kido | Japan | F I N W | Kido | 19 | 10/00 | 06/03 | 08/05 | 03/08 | 94 | 350 | 291 | 501 | V 0.10 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 1000 | 84 | 36 | (F) | |
Poço do Magro | Brazil | W | Poço do Magro | 32 | - /03 | - /04 | - /05 | - /06 | 29 | 540 | 58 | 68 | 64 | 16 | (N) | |||||||||
Xixi | China | F H I W | Daxi | 85 | - /03 | - /04 | - /05 | - /06 | 71 | 243 | 231 | 244 | (F) | |||||||||||
Kinta | Malaysia | W | Kinta | 30 | 01/03 | 02/04 | 03/06 | 07/06 | 90 | 792 | 952 | 975 | V | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 300 | 100 | 100 | (F) | |
Pine Brook | USA | W | 1 | 01/05 | 10/05 | 04/06 | - /06 | 26 | 170 | 27 | 30 | V | (7) | (17) | separate | 300 | 300 | 95 | 59 | (F) | ||||
Baise | China | F H I N W | Youjiang | 5660 | 12/01 | 12/02 | 04/06 | 07/06 | 130 | 720 | 1995 | 2672 | V | (9) | 0.80 | (1) | 0.80 | (1) | 300 | 3000 | 80 50 | 132 110 | (F) | |
Al Wehdah | Jordan/ Syria | W | Yarmouk | 110 | 06/03 | 02/05 | 07/06 | 12/07 | 103 | 485 | 1426 | 1478 | V 0.60 | (3') | 0.80 | (3')* | 0.80 | 300 | 300 | 70 60 | 60 60 | (F) | ||
Ntimbale | Botswana | W | 26 | 11/04 | 04/06 | 09/06 | 05/07 | 33 | 153 | 30 | ||||||||||||||
Genesee #2 | USA | W | Bear Creek | 1 | 06/06 | 11/06 | 11/06 | 10/07 | 29 | 168 | 24 | V | 300 | 300 | ||||||||||
Nagai | Japan | F H N W | Okitamano | 51 | 03/00 | 10/02 | 11/06 | 03/11 | 126 | 381 | 703 | 1200 | V 0.50 | (1) (1) | 0.73 | (1) | 0.73 | (1) | 250 | 1000 | 91 | 39 | (F) | |
El Guapo | Venezuela | F I W | El Guapo | 141 | 08/05 | 04/06 | 12/06 | 08/07 | 50 | 138 | 320 | 342 | 0.60 | (1) | 0.85 | (17) | 1.80 | (1) | 300 | 300 | 75 | 0 | (-) - | |
Flor do Sertão | Brazil | W | 05/05 | - /05 | - /06 | 10/06 | 19 | 245 | ||||||||||||||||
El Sauz | Mexico | W | - /04 | - /05 | - /06 | - /07 | 30 | |||||||||||||||||
Zaoshi | China | F H N W | Dieshui | 1439 | - /04 | - /05 | - /06 | - /07 | 88 | 351 | 450 | 930 | V 0.25 | (3') | 0.80 | (3') | 0.75 | (1) | 300 | 3000 | 53 83 | 99 102 | (F) | |
Hickory Log Creek | USA | W | Hickory Log Creek | 1 | 10/05 | 12/06 | 06/07 | 10/07 | 55 | 290 | 165 | V | (8) | 0.80 | (3')* | 0.80 | (1) | 300 | 300 | 89 80 74 | 89 98 104 | (F) | ||
Longtan (Stage 1) | China | F H N W | Hongshui | 16210 | 07/01 | 10/04 | 06/07 | 12/09 | 192 | 832 | 4623 | 7400 | V 0.25 | (3') | 0.70 | (3') | 0.68 | (12) | 300 | 300 | 99 86 | 121 109 | (F) | |
R’Mel (formerly Tanger-Med) | Morocco | F W | R’Mel | 25 | 05/05 | 06/06 | 06/07 | 10/07 | 79 | 250 | 230 | 243 | V | (11) | 0.75 | (1) | 0.75 | (1) | 300 | 3000 | 100 90 | 0 0 | (-) - | |
Taishir | Mongolia | H I W | Zabkhan | 930 | 02/05 | 05/06 | 06/07 | 12/07 | 60 | 200 | 210 | 250 | V | (2) | 0.72 | (1)* | 0.72 | (12)* | 333 | 333 | 75 | 0 | (-) - | |
Yacoub El Mansour (formerly Ouirgane) | Morocco | W | N’Fis | 70 | 07/05 | 10/06 | 07/07 | 03/08 | 71 | 233 | 202 | 216 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 3000 | 100 | 0 | (-) - | |
Elkwater Fork | USA | W | Tygart Tributory | 3 | - /06 | 04/07 | 08/07 | - /07 | 39 | 204 | 106 | 113 | V | (8) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 59 | 89 | (F) | |
Meander | Australia | I W | Meander | 43 | 01/06 | 01/07 | 08/07 | 12/07 | 47 | 180 | 85 | 85 | V | (4) | 0.70 | (10) | 0.70 | (10) | 300 | 300 | 70 | 0 | (-) - | |
Dinh Binh | Vietnam | F H I W | Kon | 226 | 05/02 | 08/05 | 12/07 | 12/08 | 55 | 571 | 183 | 430 | V | (11) | 0.75 | (3') | ogee | (12) | 300 | 900 | 70 126 | 175 141 | (F) | |
Hongkou | China | H W | Huotong | 449 | - /03 | - /05 | - /07 | - /08 | 130 | 341 | 681 | 830 | ||||||||||||
Serra Preta | Brazil | W | 5 | - /05 | - /05 | - /07 | - /08 | 34 | 154 | 44 | 51 | V | 0.80 | 0.80 | 80 | 20 | (N) | |||||||
Shihu | China | F I W | Lituohe | 58 | - /05 | - /06 | - /07 | - /08 | 56 | 193 | 162 | 354 | ||||||||||||
Menghekou | China | F I R W | Menghe | 11 | - /05 | - /06 | - /07 | - /08 | 78 | 215 | 160 | 249 | ||||||||||||
Bailianya [A] | China | F H I W | Dongpi | 480 | - /05 | - /06 | - /07 | 04/09 | 105 | 422 | 485 | 600 | V | (1) | 0.335 | (1) | 0.335 | (1) | 300 | 3000 | 72 56 | 108 84 | (F) | |
Sidi Yahya (formerly Ain Kwachia) | Morocco | I W | Khellata | 11 | 01/07 | 05/07 | 07/08 | 11/08 | 30 | 213 | 60 | 78 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 105 | 0 | (-) - | |
Toppu | Japan | F I W | Toppu | 36 | 07/02 | 06/05 | 10/08 | 03/14 | 78 | 309 | 440 | 530 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 1000 | 84 | 36 | (F) | |
Boussiaba | Algeria | W | Boussiaba | 120 | 12/06 | 05/08 | 11/08 | 08/09 | 51 | 310 | 160 | 190 | V | (2) | (1) | (1) | 300 | 300 | 112 | 28 | (F) | |||
Picachos | Mexico | I W | Presidio | 322 | 02/07 | 09/07 | - /08 | - /09 | 85 | 256 | 85 | V 0.15 | (12) (12) | 0.85 | (12) | 0.85 | (12) | 300 | 3000 | 50 | 45 | (S) | ||
Wadi Dayqah | Oman | W | Wadi Dayqah | 100 | 08/06 | 01/08 | 04/09 | 11/09 | 75 | 410 | 590 | 650 | V | (3') | 0.75 | (3')* | 0.75 | (3')* | 300 | 1200 | 126 112 | 54 48 | (M) | |
Bear Creek | USA | F W | Bear Creek | 47 | 01/08 | 10/08 | 05/09 | 06/09 | 27 | 292 | 60 | 69 | V | (1) | 0.80 | (1)* | 300 | 300 | 77 | 77 | (F) | |||
Kasegawa | Japan | F H I W | Kase | 71 | 02/05 | 10/07 | 06/09 | 03/12 | 99 | 456 | 830 | 948 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 250 | 1000 | 84 | 36 | (F) | |
Deep Creek Nº5D | USA | F W | Deep Creek | 15 | 12/08 | 04/09 | 12/09 | 07/10 | 22 | 226 | 39 | 45 | V | (3') | 0.80 | (3')* | 0.80 | (1)* | 300 | 300 | 89 | 89 | (F) | |
Wudu | China | F H I W | Fu | 572 | 10/04 | - /07 | - /09 | - /10 | 120 | 631 | 1151 | 1580 | V | (3') | 0.75 | (3') | 0.80 | (3') | (F) | |||||
Cristalandia | Brazil | W | de Contas | 13 | - /05 | - /07 | - /09 | - /10 | 18 | 337 | 61 | 68 | ||||||||||||
Baishiya | China | H I W | Xijiang | 26 | - /04 | - /07 | - /09 | - /12 | 74 | 190 | 230 | 240 | 0.75 | |||||||||||
Xiaotianlong | China | W | Tuochang | 1 | - /07 | - /08 | - /09 | - /09 | 58 | 168 | 125 | |||||||||||||
Mulungu do Morro | Brazil | I W | Tijuco | 2 | - /07 | - /08 | - /09 | 03/10 | 16 | 156 | 13 | |||||||||||||
Poço Marrua | Brazil | I W | Parnaiba | 293 | - /07 | - /08 | - /09 | - /10 | 48 | 870 | 293 | 306 | ||||||||||||
Barra do Coqueiros | Brazil | H W | Claro | 1 | 08/07 | - /08 | - /09 | 07/10 | 60 | 1670 | 172 | 282 | ||||||||||||
Yangjiayuan [A] | China | H W | Tongzhi | 78 | - /07 | - /08 | - /09 | - /10 | 68 | 153 | ||||||||||||||
Sehb el Merga | Morocco | F I W | Sehb el Merga | 7 | 06/07 | - /08 | - /09 | - /10 | 37 | 480 | 85 | 95 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 | 25 | (N) | |
Adnan Mendres (formerly Çine) | Turkey | F H I W | Çine | 350 | 12/95 | 11/04 | 04/10 | 10/11 | 137 | 300 | 1560 | 1650 | 0.10 0.20 | (7') | 0.85 | (7') | 0.85 | (7') | 300 | 300 | 85 75 | 105 95 | (F) | |
Ulu Sepri (formerly Batu Hampar) | Malaysia | W | Batu Hampar | 3 | 11/07 | 10/09 | 04/10 | 05/10 | 65 | 236 | 200 | 203 | (3') | (10) | (10) | 300 | 1200 | 65 | 120 | (F) | ||||
Bengoh | Malaysia | W | Sungai Bengoh | 144 | 06/07 | 06/09 | 05/10 | - /12 | 63 | 267 | 130 | 172 | V | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 3000 | 60 | 120 | (F) | |
Zirdan | Iran | I W | Kajoo | 207 | 11/02 | 08/07 | 08/10 | 11/10 | 65 | 350 | 265 | 437 | (5) | (3) | 300 | 300 | 98 | 42 | (N) | |||||
Abou Al Abbas Sebti (formerly Taskourt) | Morocco | I W | Al Mal | 25 | 01/08 | 04/09 | 09/10 | 04/11 | 75 | 408 | 415 | 490 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 73 | 32 | (N) | |
Saladillo | Argentina | W | Quinto | 02/09 | 09/09 | 09/10 | 01/11 | 79 | 487 | 210 | 249 | (5) | (5) | |||||||||||
Wyaralong | Australia | W | Teviot Brook | 1 | 09/09 | 04/10 | 12/10 | 06/11 | 48 | 464 | 173 | (1) | (1) | (1) | 300 | 300 | 85 | 85 | (F) | |||||
Gasparino | Brazil | W | - /07 | - /08 | - /10 | 10/10 | 28 | 1000 | 130 | |||||||||||||||
Ingazeira (formerly San Antonio) | Brazil | W | Pajeú | 49 | - /08 | - /09 | - /10 | - /11 | 26 | 566 | 64 | 92 | ||||||||||||
Ait Moulay Ahmed | Morocco | I W | Ain Leuh | 2 | 10/09 | - /10 | 01/11 | 10/11 | 29 | 136 | 18 | 20 | V | (5) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 70 | 30 | (N) | |
Las Tunas | Argentina | F I W | Las Tunas | 101 | 02/09 | 09/10 | 02/11 | 12/11 | 33 | 259 | 30 | 56 | V | (1) | 200 | 400 | 85 | 25 | (N) | |||||
Yunishigawa | Japan | F I W | Yunishi | 75 | 08/08 | 09/09 | 05/11 | 09/12 | 119 | 320 | 967 | 1053 | V 0.60 | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 1000 | 91 | 39 | (F) | |
Yubari Syuparo | Japan | F H I W | Yubari | 427 | 11/03 | 10/09 | 09/11 | 03/15 | 111 | 390 | 584 | 940 | V 0.80 | (1) (1) | 0.82 | (1) | 0.82 | (1) | 250 | 750 & 1000 | 91 | 39 | (F) | |
Lusixi | China | W | Lusixi | 33 | - /09 | - /10 | - /11 | - /12 | 39 | 140 | ||||||||||||||
Silopi | Turkey | H W | Hezil | 29 | 08/08 | - /10 | - /11 | 02/12 | 89 | 356 | 718 | 752 | 0.10 | (7) | 0.70 | (3')* | 0.70 | (1) | 300 | 300 | 81 | 39 | (-) - | |
Madushan | China | H N W | Honghe | 552 | - /08 | - /09 | - /11 | - /12 | 108 | 353 | 987 | |||||||||||||
Ahl Lafouim | Morocco | W | 3 | - /09 | - /10 | - /11 | - /12 | 15 | 20 | 24 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | ||||||||
Laananat | Morocco | W | 1 | - /09 | - /10 | - /11 | - /12 | 15 | 18 | 20 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | ||||||||
Krayma | Morocco | W | Tiyoughza | 3 | - /09 | - /10 | - /11 | - /12 | 32 | 45 | 53 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 120 100 | 0 | (-) - | ||||
Middle Vaitarna | India | W | Vaitarna | 202 | 10/08 | 05/10 | 04/12 | - /12 | 102 | 565 | 1202 | 1500 | 0.15 | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 75 | 145 | (F) | |
San Vicente Dam Raise | USA | W | San Diego | 299 | 06/09 | 08/11 | 09/12 | 09/14 | 103 | 474 | 459 | 465 | V | (4') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 86 | 127 | (F) | |
Enlarged Cotter | Australia | W | Cotter | 78 | 10/09 | 08/11 | 12/12 | 08/13 | 87 | 350 | 369 | 400 | V | (3') | 0.75 | (3') | 0.75 | (3')* | 300 400 | 300 400 | 75 | 120 | (F) | |
Longkaikou | China | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | |||
Marrecas | Brazil | W | Marrecas | 33 | 03/10 | - /11 | - /12 | 12/12 | 35 | 430 | ||||||||||||||
Mamoeiro | Brazil | W | 21 | - /10 | - /11 | - /12 | - /13 | 15 | ||||||||||||||||
Spring Grove | South Africa | W | Mooi | 140 | 03/11 | 06/12 | 05/13 | 05/14 | 39 | 300 | 96 | 114 | (3') | (3') | 300 | 300 | 50 | 110 | (F) | |||||
De Hoop | South Africa | W | Steelpoort | 347 | 07/07 | 07/09 | 11/13 | 03/14 | 85 | 1015 | 769 | 1012 | V | (3') | (3')* | (3')* | 300 | 1200 | 62 | 145 | (F) | |||
Kalashuke | China | F H W | E’erqisi | 2419 | - /07 | - /10 | - /13 | - /14 | 122 | 1489 | 2520 | 2890 | 0.75 | 0.75 | 300 | 3000 | (F) | |||||||
Lizhou [A] | China | H W | Muli | 190 | - /09 | - /11 | - /13 | - /14 | 132 | 211 | ||||||||||||||
Los Panales | Mexico | W | Tecolotán | 100 | 01/11 | - /12 | - /13 | - /13 | 78 | 440 | 496 | 561 | 0.20 V | (5) | 0.80 | (3) | 0.80 | (3) | 300 | 300 | 110 | 0 | (N) | |
Barra do Rio Chapéu | Brazil | H W | Braço do Norte | 21 | - /12 | - /12 | - /13 | - /13 | 21 | |||||||||||||||
Aslandag | Turkey | H I W | Bembo | 11 | 09/08 | 11/11 | 02/14 | 11/14 | 69 | 210 | 162 | 202 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 100 | 80 | (N) | |
Cheshmeh Ashegh | Iran | F I W | Cheshmeh Ashegh | 62 | 06/10 | 10/11 | 05/14 | 03/17 | 60 | 375 | 130 | 250 | (1) | (1) | (12) | 300 | 600 - 900 | 120 | 80 | (N) | ||||
Hantangang | South Korea | F I W | Hantan | 270 | 02/09 | 07/10 | 07/14 | 12/14 | 84 | 690 | 650 | 709 | V | (1) | (1) | (1) | 250 | 750 | 91 | 39 | (F) | |||
Metolong | Lesotho | W | South Phuthiatsana | 64 | 09/11 | 08/13 | 11/14 | 04/15 | 83 | 278 | 280 | 314 | (3') | (3') | (3') | 300 | 300 | 60 | 145 | (F) | ||||
Tiouine | Morocco | F I W | Iriri | 270 | 05/10 | - /11 | - /14 | - /15 | 84 | 202 | 270 | 380 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 100 | 0 | (-) - | |||
Songyue Dam Raise | China | F H I R W | Hailanhe | - /12 | - /13 | - /14 | - /15 | 41 | 271 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |||||
Serro Azul | Brazil | W | 303 | - /12 | - /13 | - /14 | - /15 | 66 | 1015 | |||||||||||||||
Kahe | China | W | 20 | - /12 | - /13 | - /14 | - /15 | 72 | ||||||||||||||||
Gokayama | Japan | F N W | Naka | 40 | 06/12 | 06/14 | 07/15 | 03/18 | 103 | 556 | 634 | 935 | V 1.00 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 1000 | 104 | 26 | (F) | |
Tabellout [A-G] | Algeria | I W | Djen Djen | 294 | 03/10 | 03/13 | 08/15 | 12/15 | 121 | 366 | 975 | (12) | (12) | (12)* | 300 | 300 | 85 | 45 | ||||||
Duck River | USA | W | Duck | 31 | 01/14 | - /15 | 09/15 | - /16 | 41 | 90 | 121 | 128 | 0.10 | (1) (3) | 1.00 | (1')* (3')* | 300 | 300 | 107 | 55 | (F) | |||
Igarapeba | Brazil | W | Una | 69 | - /13 | - /14 | - /15 | - /16 | 61 | |||||||||||||||
Bogovina | Serbia | F H I W | Cmi Timok | 48 | - /12 | - /14 | - /15 | - /16 | 54 | 396 | 175 | 305 | ||||||||||||
Akçakoca | Turkey | I W | Sarma | 2 | 01/13 | 05/15 | 10/16 | - /17 | 66 | 148 | 85 | 130 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | |||||
Boqaata | Lebanon | W | Boqaata | 6 | 07/12 | 04/15 | 12/16 | 12/21 | 72 | 222 | 200 | 255 | V 0.80 | (12) | 0.80 | (3')* | 0.80 | (3')* | 300 | 300 | 90 | 0 | (-) - | |
Cacimba Nova | Brazil | I W | 3 | - /13 | - /14 | - /16 | - /16 | 18 | 196 | 52 | ||||||||||||||
Kelebek | Turkey | I W | Kelebek | 23 | - /12 | - /14 | - /16 | - /17 | 62 | 193 | 74 | 97 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 120 | (F) | ||
Güdül Kırkkavak | Turkey | I W | Ormanlik | 1 | - /14 | - /15 | - /16 | 10/17 | 49 | 265 | 114 | |||||||||||||
Rkiza | Morocco | F I W | 17 | - /13 | - /15 | - /16 | - /17 | 26 | 500 | 55 | 60 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | |||||||
Karareis | Turkey | W | Camibogazi | 10 | - /14 | - /15 | - /16 | - /17 | 50 | 295 | 142 | 173 | 0.05 | (3') | 0.80 | (3') | 0.80 | (12) | 300 | 300 | 98 | 52 | (F) | |
Guanchang | China | H I W | w | 24 | - /14 | - /15 | - /16 | - /17 | 54 | 246 | ||||||||||||||
Ibn Hammad | Jordan | G W | Ibn Hammad | 4 | - /15 | 12/16 | 07/17 | - /22 | 56 | 160 | 160 | 160 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 90 100 | 0 0 | (-) - | |
Enciso | Spain | I W | Cidacos | 47 | - /08 | 08/14 | 07/17 | 09/18 | 103 | 376 | 695 | 765 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 140 | (F) | |
Ouldjet Mellegue | Algeria | I W | Mellegue | 155 | 10/11 | - /13 | - /17 | - /18 | 51 | 900 | 245 | 320 | V | (11) | 0.90 | (10) | 0.90 | (12) | 300 | 300 | 110 | 0 | (-) - | |
El Bolsón | Argentina | I W | Albigasta | 38 | - /08 | - /13 | - /17 | - /19 | 64 | 380 | 279 | |||||||||||||
Shangshui [A] | China | I W | 12 | - /13 | - /15 | - /17 | - /18 | 58 | 269 | |||||||||||||||
Üniversite | Turkey | W | Çırçıp | 1 | - /15 | - /16 | - /17 | - /17 | 36 | 110 | 20 | |||||||||||||
Ximihe | China | H I W | Ximihe | 17 | - /14 | - /16 | - /17 | - /18 | 88 | 147 | ||||||||||||||
Fendou | China | F H I W | Mulenghe | 191 | - /15 | - /16 | - /17 | - /18 | 46 | 406 | ||||||||||||||
Xiahushan | China | F H I W | Dashahe | 196 | - /15 | - /16 | - /17 | - /18 | 74 | 296 | ||||||||||||||
Wugachong [A] | China | H I W | Mabiehe | 99 | - /15 | - /16 | - /17 | - /18 | 108 | 182 | ||||||||||||||
Irahara | Japan | F W | Harai | 29 | 07/14 | 07/15 | 03/18 | 03/19 | 81 | 295 | 372 | 419 | V 0.60 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 84 | 36 | (F) | |
Shangcun | China | W | Shangcunxi | 123 | - /11 | - /14 | - /18 | - /19 | 89 | 338 | ||||||||||||||
Tuy IV | Venezuela | W | Cuira | - /14 | - /16 | - /18 | - /19 | 135 | 1700 | 1950 | ||||||||||||||
Colonia | Brazil | W | Colonia | 62 | 09/15 | - /17 | - /18 | 09/18 | 21 | 195 | 30 | 34 | ||||||||||||
Zhuangli | China | F H I W | Shizhe | 133 | - /15 | - /17 | - /18 | - /19 | 44 | 49 | ||||||||||||||
Melen | Turkey | H I W | Melen | 693 | - /13 | 06/15 | 03/19 | 05/19 | 124 | 944 | 1871 | 2096 | 0.15 | (3') | 0.70 | (3')* | 0.70 | (3') | 300 | 300 | 90 | 60 | (F) | |
Yamba | Japan | F H I N W | Agatsuma | 108 | 08/14 | 05/17 | 05/19 | 10/19 | 116 | 291 | 911 | 0.15 | (1) | 0.80 | (1) | 0.08 | (1) | 250 | 1000 | 84 | 36 | (F) | ||
Panelas II | Brazil | W | 23 | - /16 | - /17 | 06/19 | - /20 | 55 | ||||||||||||||||
Taşköprü Hasanlı | Turkey | I W | Ayvali | 988 | 06/14 | 04/17 | 08/19 | 11/19 | 43 | 157 | 37 | 46 | 0.10 | (1) | 0.80 | (1) | 300 | 66 | 44 | (F) | ||||
Tasköprü Çay | Turkey | I W | Uludere | 1 | 03/17 | 07/18 | 09/19 | 08/20 | 52 | 122 | 55 | 0.10 | (1) | 0.80 | (1) | 300 | 75 | 50 | ||||||
Karamürsel Ihsaniye | Turkey | I W | Suludere | 9 | 03/16 | 07/17 | 09/19 | 10/19 | 69 | 212 | 130 | 185 | 0.10 | (1) | 0.80 | (1) | 300 | 300 | 75 | 45 | (F) | |||
Taquarembó | Brazil | W | Taquarembó | 05/08 | - /10 | - /19 | - /20 | 33 | 330 | |||||||||||||||
Shah wa Arüs | Afghanistan | F H I W | Shakardar | 10 | - /12 | - /13 | - /19 | 04/21 | 78 | 303 | 270 | 337 | V 0.20 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 105 | 45 | (N) | |
Ghadrooni | Iran | G I W | Gharanghou | 44 | - /08 | - /14 | - /19 | - /20 | 44 | 352 | 106 | 147 | ||||||||||||
Pingzhai | China | H I W | Sanchahe | 1089 | - /13 | - /15 | - /19 | - /21 | 163 | |||||||||||||||
Bicentennial/Los Pilares | Mexico | F I W | Mayo | 478 | 02/14 | - /16 | - /19 | 08/20 | 73 | 232 | 600 | 300 | 300 | |||||||||||
Mangshan | China | F H I W | Changlehe | 133 | - /15 | - /17 | - /19 | - /20 | 101 | 355 | ||||||||||||||
Negreiros | Brazil | W | - /17 | - /18 | - /19 | - /20 | 35 | 249 | 56 | |||||||||||||||
Yunzhen | China | F I W | 96 | - /16 | - /19 | 03/20 | 01/21 | 76 | 173 | |||||||||||||||
Agdez | Morocco | F I W | Draa | 247 | 05/16 | 03/19 | 09/20 | 06/21 | 110 | 317 | 833 | 993 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | (N) | |||||
Ballikaya | Turkey | W | Mudurnu | 143 | - /13 | - /15 | - /20 | - /23 | 98 | 357 | 800 | 0.10 0.35 | (1) | 0.70 | (1) | 300 | 300 | 63 83 | 63 83 | |||||
Hirase | Japan | F H W | Nishiki | 30 | - /10 | - /16 | - /20 | - /22 | 73 | 300 | 340 | |||||||||||||
Huokou | China | H W | Aojiang | 297 | - /15 | - /18 | - /20 | - /21 | 91 | 420 | 300 | 663 | 0.10 | 0.76 | 0.76 | (F) | ||||||||
Tan My | Vietnam | H I W | Cai | 219 | - /16 | - /18 | - /20 | - /21 | 67 | 1130 | ||||||||||||||
Center Hill Auxiliary Backup Dam | USA | F H R W | Caney Fork | 940 | - /17 | - /19 | - /20 | - /21 | 40 | 293 | 99 | 122 | V | (1) | V 0.83 | (1)* | 0.83 | (1)* | 300 | 300 | 93 | 93 | (F) | |
Kabagawa | Japan | F W | Kaba | 11 | 10/14 | 11/16 | 05/21 | 09/22 | 89 | 266 | 242 | 448 | V 0.40 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 91 | 39 | (F) | |
El Zapotillo | Mexico | W | Verde | 910 | - /09 | 11/11 | - /21 | - /22 | 132 | 271 | 1100 | 1200 | V | (3') | 0.83 | (3)* | 0.83 | (3)* | 300 | 300 | 60 to 80 | 50 to 70 | (S) | |
Divaresh | Iran | I W | Kharshak | 3 | - /13 | - /15 | - /21 | - /23 | 45 | 195 | ||||||||||||||
Kaddoussa | Morocco | F I W | Guir | 220 | - /16 | - /18 | - /21 | - /21 | 62 | 271 | 180 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | (N) | |||
Tiddas | Morocco | F I W | Bou Regreg | 500 | - /16 | - /18 | - /21 | - /22 | 106 | 345 | 900 | 1 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | ||||
Yanagawa | Japan | F H W | Yana | 19 | - /15 | - /18 | - /21 | - /23 | 77 | 243 | 233 | |||||||||||||
Gümüshane Bahçecik | Turkey | W | Şenkale Deresi | 3 | 06/17 | 11/18 | - /21 | - /22 | 67 | 273 | 148 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | (N) | ||||||
Toudgha | Morocco | F I W | Toudgha | 33 | 11/17 | - /19 | - /21 | - /22 | 68 | V | (1) | 0.90 | (1)* | 0.90 | (1)* | |||||||||
San Julian | Mexico | W | Fuerte | - /16 | - /19 | - /21 | - /22 | 44 | 240 | |||||||||||||||
Bastora | Iraq | I W | Bastora | 206 | - /13 | 03/19 | - /21 | - /22 | 85 | 577 | 1160 | 1223 | V | 0.80 | 0.80 | |||||||||
Salipazan | Turkey | I W | Degimendere | 16 | - /17 | - /20 | - /21 | - /22 | 89 | 396 | 430 | |||||||||||||
Shafaroud | Iran | H I W | Shafaroud | 53 | 03/12 | 03/20 | 07/22 | 11/22 | 101 | 372 | 950 | 1180 | 0.10 0.50 | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | ||||
Sidi Abbou | Morocco | F H I W | Leben | 198 | 01/20 | 10/20 | 10/22 | 10/24 | 71 | 111 | 200 | |||||||||||||
Fask | Morocco | F I W | Assayad | 79 | 07/17 | 01/19 | 12/22 | 07/23 | 77 | 830 | 1400 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | (N) | ||||
Chame Shir [A-G] | Iran | F H I W | Zohreh | 2300 | - /11 | - /16 | - /22 | - /23 | 151 | 680 | 1100 | 1200 | V | 0.70 | 300 | 300 | 160 | 0 | (-) - | |||||
Biratori | Japan | F H I N W | Nukabira | 46 | - /13 | - /17 | - /22 | - /24 | 57 | 600 | 180 | V | (1) | 0.78 | (1) | 0.78 | (1) | |||||||
Baghan | Iran | F I W | Baghan | 32 | - /14 | - /18 | - /22 | - /26 | 58 | 311 | 220 | |||||||||||||
Kağızman | Turkey | I W | Kötek | 22 | - /16 | - /19 | - /22 | - /24 | 69 | 163 | 180 | 0.10 | (1) | 0.80 | (1) | |||||||||
Tingzikou | China | F H I N W | Jialing | 4067 | 11/09 | - /19 | - /22 | - /25 | 116 | 995 | ||||||||||||||
Ulus Eldeş | Turkey | I W | Karakuz Creek | 1 | - /16 | - /20 | - /22 | - /23 | 46 | 125 | 38 | V 0.10 | (1) (1) | 0.80 | (1) | 300 | 83 | 68 | (F) | |||||
El-Janneh [A-G] | Lebanon | H I W | Ibrahim (Abraham) | 38 | - /15 | 02/20 | - /22 | - /22 | 160 | 350 | 1450 | 300 | 300 | |||||||||||
Jalaur | Philippines | F H I W | Jalaur | - /19 | - /21 | - /22 | - /23 | 109 | ||||||||||||||||
La Libertad | Mexico | W | San Fernando | 221 | - /20 | - /21 | - /23 | - /24 | 47 | |||||||||||||||
Bahçecik | Turkey | W | 3 | - /16 | - /19 | - /23 | - /24 | 69 | 204 | |||||||||||||||
Aldegirmen | Turkey | I W | Akasya | 24 | - /17 | - /20 | - /23 | - /24 | 59 | 227 | 189 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 55 | 45 | (F) | ||
Zimari | Turkey | W | Zimari | 2 | - /18 | - /21 | - /23 | - /24 | 37 | 126 | 80 | |||||||||||||
Gölecik | Turkey | I W | Gölecik | 36 | 12/16 | 02/21 | 06/24 | - /24 | 95 | 424 | 900 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 72 | 48 | (F) | ||
Ntabalanga | South Africa | I W | Itsitsa | 09/19 | 07/22 | 10/24 | 05/25 | 75 | 240 | |||||||||||||||
Monti Nieddu (Sa Stria) | Italy | I W | Monti Nieddu | 35 | 01/98 | 01/18 | - /24 | - /25 | 88 | 360 | 333 | 449 | 0.05 | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 90 | 55 | (F) | |
Gwayi-Shangani | Zimbabwe | W | Gwayi | 634 | 09/04 | - /22 | - /24 | - /25 | 70 | 305 | 300 | 60 | 140 | (F) | ||||||||||
Dashte Palang | Iran | F I W | Dashte Palang | 151 | 07/13 | - /22 | - /24 | - /25 | 56 | 350 | 540 | 690 | ||||||||||||
Tekke Kavakli | Turkey | I W | Çat | 2 | - /19 | - /22 | - /24 | - /25 | 42 | 325 | 225 | |||||||||||||
Mashkid 2 | Iran | F I W | Simish & Mashkid | 115 | 10/17 | 04/22 | - /24 | - /25 | 36 | 1450 | 650 | 850 | ||||||||||||
Nwamitwa | South Africa | W | Groot Letaba | - /17 | - /22 | - /25 | - /26 | 44 | 350 | 170 | 226 | |||||||||||||
Sarıçay | Turkey | W | Sançay | 67 | - /20 | - /22 | - /26 | - /27 | 125 | 441 | 1163 | |||||||||||||
Tang e Mashooreh | Iran | F I W | Kaskkan | 55 | - /13 | - /22 | - /28 | - /29 | 73 | 220 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shimaji
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/76
Start of RCC: 09/76
End of RCC: 04/80
End of Project: 03/81
Specifications
Height: 89 metres
Length: 240 metres
Volume of RCC: 165 m3x103
Total volume: 317 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.30 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
150 to | 500 |
200 | 700 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Copperfield
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 09/84
End of Project: 09/84
Specifications
Height: 40 metres
Length: 340 metres
Volume of RCC: 140 m3x103
Total volume: 156 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
0.90 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Middle Fork
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 05/84
Start of RCC: 05/84
End of RCC: 09/84
End of Project: 11/84
Specifications
Height: 38 metres
Length: 125 metres
Volume of RCC: 42 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
conduit |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
66 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Upper Howard Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/84
Start of RCC: 06/84
End of RCC: 11/84
End of Project: 01/85
Specifications
Height: 23 metres
Length: 363 metres
Volume of RCC: 24 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
1.00 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
104 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Cow Creek
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: 07/84
Start of RCC: 07/84
End of RCC: 08/85
End of Project: 10/85
Specifications
Height: 50 metres
Length: 290 metres
Volume of RCC: 161 m3x103
Total volume: 171 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
53 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
51 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Cala
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/84
Start of RCC: 07/84
End of RCC: 10/85
End of Project: 12/85
Specifications
Height: 25 metres
Length: 124 metres
Volume of RCC: 14 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
450 | 450 |
Cementitious material
Cement (kg/m3) |
---|
72 |
61 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
116 | Low-lime flyash (ASTM Class F) |
120 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Youxi
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 04/86
End of Project: 11/86
Specifications
Height: 57 metres
Length: 123 metres
Volume of RCC: 43 m3x103
Total volume: 62 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 & | 250 & |
500 | 500 |
Cementitious material
Cement (kg/m3) |
---|
60 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |
80 |

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Coal
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 01/86
Start of RCC: 01/86
End of RCC: 06/86
End of Project: 08/86
Specifications
Height: 25 metres
Length: 247 metres
Volume of RCC: 22 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
1.00 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
60 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tama
Reservoir capacity: 254 m3x106
Construction Dates
Start of Project: 08/80
Start of RCC: 08/80
End of RCC: 07/86
End of Project: 12/90
Specifications
Height: 100 metres
Length: 441 metres
Volume of RCC: 772 m3x103
Total volume: 1150 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.81 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.81 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
150 - | 750 |
200 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Grindstone
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 09/85
Start of RCC: 09/85
End of RCC: 07/86
End of Project: 10/86
Specifications
Height: 42 metres
Length: 432 metres
Volume of RCC: 88 m3x103
Total volume: 96 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
76 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Wanaque
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/85
Start of RCC: 05/85
End of RCC: 08/86
End of Project: 11/86
Specifications
Height: 48 metres
Length: 670 metres
Volume of RCC: 219 m3x103
Total volume: 232 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.78 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Little Fish
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 09/84
Start of RCC: 09/84
End of RCC: 08/86
End of Project: 10/87
Specifications
Height: 30 metres
Length: 300 metres
Volume of RCC: 35 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.60 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.60 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
58 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
58 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gravata
Reservoir capacity: 97 m3x106
Construction Dates
Start of Project: 07/85
Start of RCC: 07/85
End of RCC: 10/86
End of Project: 06/87
Specifications
Height: 56 metres
Length: 230 metres
Volume of RCC: 132 m3x103
Total volume: 143 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Olifants
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: 09/85
Start of RCC: 09/85
End of RCC: 11/86
End of Project: 07/87
Specifications
Height: 36 metres
Length: 455 metres
Volume of RCC: 101 m3x103
Total volume: 142 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork [stepped face] |
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
36 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
74 | Ground-granulated blast-furnace slag |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Slang
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: 05/85
Start of RCC: 05/85
End of RCC: 03/87
End of Project: 09/88
Specifications
Height: 47 metres
Length: 527 metres
Volume of RCC: 97 m3x103
Total volume: 134 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork [stepped face] |
0.62 |
Spillway
Slope | Type |
---|---|
0.62 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
36 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
84 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Rock Creek
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 08/87
End of Project: 12/87
Specifications
Height: 91 metres
Length: 815 metres
Volume of RCC: 1125 m3x103
Total volume: 1281 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Slip-formed/extruded facing elements |
Downstream
Slope | Type |
---|---|
0.32 | Slip-formed/extruded facing elements |
0.60 | Slip-formed/extruded facing elements |
Spillway
Slope | Type |
---|---|
0.32 | Slip-formed/extruded facing elements [stepped face] |
0.60 | Slip-formed/extruded facing elements [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
79 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
173 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Morales
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/86
Start of RCC: 06/86
End of RCC: 10/87
End of Project: 12/87
Specifications
Height: 28 metres
Length: 200 metres
Volume of RCC: 22 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
80 |
74 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
140 | Low-lime flyash (ASTM Class F) |
128 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Mano
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 01/88
End of Project: 03/90
Specifications
Height: 69 metres
Length: 239 metres
Volume of RCC: 104 m3x103
Total volume: 219 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
180 | 500 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation / Water Supply
River: Yampa
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 08/87
Start of RCC: 08/87
End of RCC: 07/88
End of Project: 11/88
Specifications
Height: 46 metres
Length: 116 metres
Volume of RCC: 34 m3x103
Total volume: 39 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
71 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
71 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Nunome
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 05/86
Start of RCC: 05/86
End of RCC: 10/88
End of Project: 12/89
Specifications
Height: 72 metres
Length: 322 metres
Volume of RCC: 110 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.40 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
78 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
42 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: -
Type: Arch-Gravity
Purpose(s): Water Supply
River: Rietspruit
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: 04/88
Start of RCC: 04/88
End of RCC: 11/88
End of Project: 09/89
Specifications
Height: 50 metres
Length: 200 metres
Volume of RCC: 45 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.60 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.60 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
61 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
142 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Lácara
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/88
Start of RCC: 05/88
End of RCC: 11/88
End of Project: 01/89
Specifications
Height: 32 metres
Length: 240 metres
Volume of RCC: 25 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.50 | RCC against formwork [stepped face] |
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
84 |
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
156 | Low-lime flyash (ASTM Class F) |
145 |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Water Supply
River: Yuxi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/85
Start of RCC: -/85
End of RCC: -/88
End of Project: -/89
Specifications
Height: 38 metres
Length: 102 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Colorado
Reservoir capacity: 700 m3x106
Construction Dates
Start of Project: 05/87
Start of RCC: 05/87
End of RCC: 04/89
End of Project: 01/90
Specifications
Height: 31 metres
Length: 173 metres
Volume of RCC: 89 m3x103
Total volume: 158 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
0.831 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
ogee | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
125 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
62 | High-lime flyash (ASTM Class C) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Chanxi
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 12/85
Start of RCC: 12/85
End of RCC: 08/89
End of Project: 09/89
Specifications
Height: 58 metres
Length: 150 metres
Volume of RCC: 71 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
0.30 | Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
54 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
82 | Low-lime flyash (ASTM Class F) |
86 |

Details
Country: South Africa
Owner: -
Type: Arch-Gravity
Purpose(s): Water Supply
River: Great Brak
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 10/89
End of Project: 11/90
Specifications
Height: 70 metres
Length: 268 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
58 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
136 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kabura
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/86
Start of RCC: 03/86
End of RCC: 01/90
End of Project: 03/92
Specifications
Height: 70 metres
Length: 300 metres
Volume of RCC: 167 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.40 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
180 | 500 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Quail Creek
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 02/90
Start of RCC: 02/90
End of RCC: 05/90
End of Project: 08/90
Specifications
Height: 42 metres
Length: 610 metres
Volume of RCC: 130 m3x103
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.85 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
conduit |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
53 | Low-lime flyash (ASTM Class F) |

Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Concepción
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 12/88
Start of RCC: 12/88
End of RCC: 06/90
End of Project: 08/90
Specifications
Height: 68 metres
Length: 694 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.075 | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Kubusie
Reservoir capacity: 94 m3x106
Construction Dates
Start of Project: 07/88
Start of RCC: 07/88
End of RCC: 07/90
End of Project: 12/90
Specifications
Height: 34 metres
Length: 737 metres
Volume of RCC: 134 m3x103
Total volume: 165 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork [stepped face] |
0.62 |
Spillway
Slope | Type |
---|---|
0.62 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
44 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
66 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Izoria and Idas
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 08/90
End of Project: 11/91
Specifications
Height: 53 metres
Length: 182 metres
Volume of RCC: 80 m3x103
Total volume: 91 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork |
Downstream
Slope | Type |
---|---|
Vertical | RCC against formwork [stepped face] |
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
160 | Low-lime flyash (ASTM Class F) |
170 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Asari
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 09/90
End of Project: 03/93
Specifications
Height: 74 metres
Length: 390 metres
Volume of RCC: 259 m3x103
Total volume: 517 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.30 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
180 | 500 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Hervás
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 09/90
End of Project: 10/90
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: 24 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Traditional concrete against precast concrete panels [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
155 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaneyama
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 10/90
End of Project: 08/93
Specifications
Height: 61 metres
Length: 257 metres
Volume of RCC: 136 m3x103
Total volume: 307 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
150 - | 500 |
200 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ecca
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 02/88
Start of RCC: 02/88
End of RCC: 12/90
End of Project: 04/91
Specifications
Height: 32 metres
Length: 380 metres
Volume of RCC: 66 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
65 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Gameleiras
Reservoir capacity: 145 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 04/91
End of Project: 05/91
Specifications
Height: 29 metres
Length: 150 metres
Volume of RCC: 27 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
52 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
13 | No pozzolan used - |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sakai
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 07/91
End of Project: 01/93
Specifications
Height: 115 metres
Length: 298 metres
Volume of RCC: 373 m3x103
Total volume: 713 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
180 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Munday Brook
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 08/90
Start of RCC: 08/90
End of RCC: 08/91
End of Project: 11/91
Specifications
Height: 52 metres
Length: 285 metres
Volume of RCC: 121 m3x103
Total volume: 135 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Slip-formed/extruded facing elements |
Downstream
Slope | Type |
---|---|
0.325 | Slip-formed/extruded facing elements [stepped face] |
0.80 | Slip-formed/extruded facing elements [stepped face] |
Spillway
Slope | Type |
---|---|
0.325 | Slip-formed/extruded facing elements [stepped face] |
0.80 | Slip-formed/extruded facing elements [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
79 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
160 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ribera de los Montes
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 09/91
End of Project: 12/91
Specifications
Height: 24 metres
Length: 167 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Slip-formed/extruded facing elements |
Downstream
Slope | Type |
---|---|
0.13 | Slip-formed/extruded facing elements [stepped face] |
0.60 |
Spillway
Slope | Type |
---|---|
0.60 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
135 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Lessarte
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/91
End of Project: 12/91
Specifications
Height: 36 metres
Length: 100 metres
Volume of RCC: 19 m3x103
Total volume: 23 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Mechanically compacted unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Double Mountain Fork
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 04/92
End of Project: -/93
Specifications
Height: 25 metres
Length: 84 metres
Volume of RCC: 22 m3x103
Total volume: 23 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
1.10 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
119 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
59 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Alzania
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 07/92
End of Project: 10/92
Specifications
Height: 58 metres
Length: 396 metres
Volume of RCC: 150 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
108 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Mill
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 07/92
End of Project: -/93
Specifications
Height: 40 metres
Length: 213 metres
Volume of RCC: 69 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
59 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
34 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Harts
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 09/92
End of Project: 05/93
Specifications
Height: 50 metres
Length: 320 metres
Volume of RCC: 132 m3x103
Total volume: 153 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
44 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
66 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Arriarán
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 09/92
End of Project: 02/94
Specifications
Height: 58 metres
Length: 206 metres
Volume of RCC: 110 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
135 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Isaac
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 07/92
Start of RCC: 07/92
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 26 metres
Length: 285 metres
Volume of RCC: 64 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with geomembrane |
1.00 | Unformed face of RCC |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
1.00 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sakoma
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 09/87
Start of RCC: 09/87
End of RCC: 11/92
End of Project: 03/97
Specifications
Height: 100 metres
Length: 378 metres
Volume of RCC: 521 m3x103
Total volume: 836 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.30 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
150 - | 750 - |
200 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Joumoua
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/89
Start of RCC: 07/89
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 57 metres
Length: 250 metres
Volume of RCC: 150 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
350 | 350 |
Cementitious material
Cement (kg/m3) |
---|
105 |
180 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | No pozzolan used - |
0 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Ashida
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: -/92
End of Project: 03/98
Specifications
Height: 85 metres
Length: 325 metres
Volume of RCC: 228 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
150 - | 750 |
200 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 377 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 05/93
End of Project: 02/94
Specifications
Height: 75 metres
Length: 196 metres
Volume of RCC: 103 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.35 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
0.35 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
54 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
103 | Low-lime flyash (ASTM Class F) |
99 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Kamo
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 07/93
End of Project: 03/94
Specifications
Height: 76 metres
Length: 228 metres
Volume of RCC: 222 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: off-stream
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 10/92
Start of RCC: 10/92
End of RCC: 08/93
End of Project: -/94
Specifications
Height: 74 metres
Length: 302 metres
Volume of RCC: 222 m3x103
Total volume: 223 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
none |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
53 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
53 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Mountain Creek
Reservoir capacity: -
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 08/93
End of Project: -/93
Specifications
Height: 21 metres
Length: 168 metres
Volume of RCC: 26 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
119 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
84 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kodama
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 12/93
End of Project: 03/97
Specifications
Height: 102 metres
Length: 280 metres
Volume of RCC: 358 m3x103
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Ground-granulated blast-furnace slag |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Miyatoko
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 06/89
Start of RCC: 06/89
End of RCC: 12/93
End of Project: 01/97
Specifications
Height: 48 metres
Length: 256 metres
Volume of RCC: 172 m3x103
Total volume: 280 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
180 | 500 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Changhuajiang
Reservoir capacity: 1710 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/93
End of Project: 07/95
Specifications
Height: 55 metres
Length: 827 metres
Volume of RCC: 485 m3x103
Total volume: 860 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
RCC against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
96 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.90 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
125 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
25 |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Taperobá
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 12/91
Start of RCC: 12/91
End of RCC: -/93
End of Project: -/94
Specifications
Height: 34 metres
Length: 296 metres
Volume of RCC: 69 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | No pozzolan used - |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Aojiang
Reservoir capacity: 172 m3x106
Construction Dates
Start of Project: 08/92
Start of RCC: 08/92
End of RCC: 05/94
End of Project: 06/95
Specifications
Height: 66 metres
Length: 274 metres
Volume of RCC: 180 m3x103
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.77 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
125 | Low-lime flyash (ASTM Class F) |
95 |

Details
Country: Mexico
Owner: -
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Water Supply
River: San Lazaro
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 06/94
End of Project: 07/94
Specifications
Height: 37 metres
Length: 176 metres
Volume of RCC: 35 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
0.20 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
220 | Milled sand |
220 |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tanghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 06/94
End of Project: -/95
Specifications
Height: 48 metres
Length: 188 metres
Volume of RCC: 55 m3x103
Total volume: 63 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.30 | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
69 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
68 | Low-lime flyash (ASTM Class F) |
85 |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Picuí
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 10/94
End of Project: -/95
Specifications
Height: 31 metres
Length: 135 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cova da Mandioca
Reservoir capacity: 126 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/94
End of Project: 12/94
Specifications
Height: 26 metres
Length: 360 metres
Volume of RCC: 75 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | No pozzolan used - |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Da Prata
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: 12/94
End of Project: -/95
Specifications
Height: 26 metres
Length: 405 metres
Volume of RCC: 61 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
[stepped face] |
Spillway
Slope | Type |
---|---|
[stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nakatsu
Reservoir capacity: 193 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 02/95
End of Project: 03/01
Specifications
Height: 156 metres
Length: 400 metres
Volume of RCC: 1537 m3x103
Total volume: 2060 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.625 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.625 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
150 - | 750 |
200 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Yoshida
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 07/91
Start of RCC: 07/91
End of RCC: 02/95
End of Project: 03/96
Specifications
Height: 75 metres
Length: 218 metres
Volume of RCC: 265 m3x103
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Takahashi
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 04/95
End of Project: 03/98
Specifications
Height: 98 metres
Length: 259 metres
Volume of RCC: 396 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.77 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.77 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Saõ Gonçalo
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 05/95
End of Project: -/96
Specifications
Height: 51 metres
Length: 116 metres
Volume of RCC: 87 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Matsu
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 06/95
End of Project: 09/96
Specifications
Height: 65 metres
Length: 296 metres
Volume of RCC: 141 m3x103
Total volume: 294 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.70 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): Hydropower / Water Supply
River: Longshanxi
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 07/95
End of Project: 10/95
Specifications
Height: 64 metres
Length: 93 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane |
0.08 | RCC against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.65 | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
0.65 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
350 | 350 |
Cementitious material
Cement (kg/m3) |
---|
80 |
79 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |
105 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Taizi
Reservoir capacity: 2168 m3x106
Construction Dates
Start of Project: 05/90
Start of RCC: 05/90
End of RCC: 09/95
End of Project: 10/95
Specifications
Height: 82 metres
Length: 1040 metres
Volume of RCC: 1240 m3x103
Total volume: 1876 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
270 - | 750 |
280 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Satsunai
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 02/87
Start of RCC: 02/87
End of RCC: 10/95
End of Project: 03/99
Specifications
Height: 114 metres
Length: 300 metres
Volume of RCC: 536 m3x103
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.40 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
78 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
42 | Ground-granulated blast-furnace slag |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Taghoucht
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 10/95
End of Project: 03/96
Specifications
Height: 36 metres
Length: 80 metres
Volume of RCC: 45 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
150 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Natural pozzolan (ASTM Class N) |
0 |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tributary of Cache La Poudre
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 11/95
End of Project: 12/95
Specifications
Height: 21 metres
Length: 70 metres
Volume of RCC: 7 m3x103
Total volume: 8 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
145 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
48 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shio
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 05/93
Start of RCC: 05/93
End of RCC: 11/95
End of Project: 03/99
Specifications
Height: 79 metres
Length: 225 metres
Volume of RCC: 299 m3x103
Total volume: 388 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
0.70 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Urayama
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 12/95
End of Project: 03/99
Specifications
Height: 156 metres
Length: 372 metres
Volume of RCC: 1294 m3x103
Total volume: 1750 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.65 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gunhe
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/95
End of Project: 07/96
Specifications
Height: 41 metres
Length: 650 metres
Volume of RCC: 272 m3x103
Total volume: 351 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
98 |
51 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
98 | Low-lime flyash (ASTM Class F) |
107 |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Paraíba
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 79 metres
Length: 674 metres
Volume of RCC: 674 m3x103
Total volume: 734 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Seridó
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 26 metres
Length: 458 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Rio Grande Nacaome
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 06/93
Start of RCC: 06/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 54 metres
Length: 320 metres
Volume of RCC: 250 m3x103
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
21 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Shima
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 05/96
End of Project: 03/98
Specifications
Height: 90 metres
Length: 330 metres
Volume of RCC: 390 m3x103
Total volume: 516 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.50 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Big Haynes Creek
Reservoir capacity: -
Construction Dates
Start of Project: 10/94
Start of RCC: 10/94
End of RCC: 06/96
End of Project: 09/96
Specifications
Height: 27 metres
Length: 427 metres
Volume of RCC: 72 m3x103
Total volume: 74 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
42 |
39 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
42 | Low-lime flyash (ASTM Class F) |
39 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Katsura
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/83
Start of RCC: -/83
End of RCC: 07/96
End of Project: 03/98
Specifications
Height: 70 metres
Length: 438 metres
Volume of RCC: 440 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
77 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
33 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Douzan
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 02/92
Start of RCC: 02/92
End of RCC: 02/97
End of Project: 03/00
Specifications
Height: 111 metres
Length: 250 metres
Volume of RCC: 355 m3x103
Total volume: 510 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
48 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dahexi
Reservoir capacity: 223 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 05/97
End of Project: 07/97
Specifications
Height: 83 metres
Length: 390 metres
Volume of RCC: 320 m3x103
Total volume: 458 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against precast concrete panels |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
96 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sorachi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 10/90
Start of RCC: 10/90
End of RCC: 07/97
End of Project: 06/00
Specifications
Height: 50 metres
Length: 445 metres
Volume of RCC: 327 m3x103
Total volume: 455 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.06 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: South Fork Clear Creek
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 08/97
End of Project: -/97
Specifications
Height: 41 metres
Length: 170 metres
Volume of RCC: 62 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
83 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Meixihe
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 01/95
Start of RCC: 01/95
End of RCC: 10/97
End of Project: 12/97
Specifications
Height: 60 metres
Length: 221 metres
Volume of RCC: 113 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |
105 |

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Cadiangullong Creek
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 12/97
End of Project: 03/98
Specifications
Height: 43 metres
Length: 356 metres
Volume of RCC: 114 m3x103
Total volume: 123 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
90 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Qinglonghe
Reservoir capacity: 859 m3x106
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 75 metres
Length: 500 metres
Volume of RCC: 585 m3x103
Total volume: 1350 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.15 |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
0.65 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
135 |
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
70 | Low-lime flyash (ASTM Class F) |
85 |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: -/86
Start of RCC: -/86
End of RCC: -/97
End of Project: -/97
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: 129 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca (Gravata)
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 56 metres
Length: 380 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sraa
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 05/98
End of Project: 09/98
Specifications
Height: 55 metres
Length: 174 metres
Volume of RCC: 165 m3x103
Total volume: 186 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Natural pozzolan (ASTM Class N) |
0 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Hienuki
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 06/98
End of Project: 03/00
Specifications
Height: 74 metres
Length: 333 metres
Volume of RCC: 141 m3x103
Total volume: 333 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ibicui-Mirim
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 07/97
Start of RCC: 07/97
End of RCC: 07/98
End of Project: 11/98
Specifications
Height: 37 metres
Length: 675 metres
Volume of RCC: 69 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Bonji
Reservoir capacity: 65 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: 10/98
End of Project: 03/01
Specifications
Height: 123 metres
Length: 393 metres
Volume of RCC: 731 m3x103
Total volume: 1160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Wild Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 08/96
Start of RCC: 08/96
End of RCC: 10/98
End of Project: 12/98
Specifications
Height: 49 metres
Length: 610 metres
Volume of RCC: 283 m3x103
Total volume: 283 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.50 | RCC supported by fill shoulders |
RCC against precast concrete panels |
Spillway
Slope | Type |
---|---|
conduit |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
58 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
41 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Dazhangxi
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 10/98
End of Project: 09/99
Specifications
Height: 87 metres
Length: 198 metres
Volume of RCC: 170 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.73 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
0.73 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
280 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
115 |
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
95 | Low-lime flyash (ASTM Class F) |
90 |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Capiibaribe
Reservoir capacity: 327 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 10/98
End of Project: -/99
Specifications
Height: 63 metres
Length: 442 metres
Volume of RCC: 442 m3x103
Total volume: 470 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Segre
Reservoir capacity: 402 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/98
End of Project: 01/00
Specifications
Height: 99 metres
Length: 630 metres
Volume of RCC: 980 m3x103
Total volume: 1016 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
0.35 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.40 | Traditional concrete against formwork |
0.65 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.65 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
70 |
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
130 | Low-lime flyash (ASTM Class F) |
130 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Yujiang
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: -/91
Start of RCC: -/91
End of RCC: 12/98
End of Project: 06/00
Specifications
Height: 69 metres
Length: 279 metres
Volume of RCC: 170 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.74 | RCC against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 5000 |
Cementitious material
Cement (kg/m3) |
---|
134 |
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
89 | Low-lime flyash (ASTM Class F) |
48 |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Bous Sbaa
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 01/97
Start of RCC: 01/97
End of RCC: 02/99
End of Project: 03/99
Specifications
Height: 54 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
20 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Fenhe
Reservoir capacity: 130 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 03/99
End of Project: 06/00
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 362 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against precast concrete panels |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
127 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
84 | Low-lime flyash (ASTM Class F) |
93 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Loushui
Reservoir capacity: 1741 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 04/99
End of Project: -/01
Specifications
Height: 131 metres
Length: 368 metres
Volume of RCC: 1100 m3x103
Total volume: 1310 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
87 |
64 46 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
107 | Low-lime flyash (ASTM Class F) |
96 107 |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Contentea Creek
Reservoir capacity: -
Construction Dates
Start of Project: 03/98
Start of RCC: 03/98
End of RCC: 04/99
End of Project: 06/09
Specifications
Height: 16 metres
Length: 781 metres
Volume of RCC: 64 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/97
Start of RCC: 09/97
End of RCC: 04/99
End of Project: 09/99
Specifications
Height: 29 metres
Length: 271 metres
Volume of RCC: 44 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.73 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
conduit |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2000 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |

Details
Country: Eritrea
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Toker
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 05/99
End of Project: 08/99
Specifications
Height: 73 metres
Length: 263 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
110 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
85 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Arroio Burati
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: 07/99
End of Project: -/00
Specifications
Height: 29 metres
Length: 219 metres
Volume of RCC: 80 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Burkina Faso
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Nakambe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 08/99
End of Project: 07/00
Specifications
Height: 18 metres
Length: 120 metres
Volume of RCC: 44 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
No pozzolan used - | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dalinghe
Reservoir capacity: 1645 m3x106
Construction Dates
Start of Project: 09/96
Start of RCC: 09/96
End of RCC: 09/99
End of Project: 12/00
Specifications
Height: 49 metres
Length: 513 metres
Volume of RCC: 111 m3x103
Total volume: 603 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
58 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
54 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
99 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-açu
Reservoir capacity: 39 m3x106
Construction Dates
Start of Project: 05/98
Start of RCC: 05/98
End of RCC: 12/99
End of Project: 02/00
Specifications
Height: 26 metres
Length: 266 metres
Volume of RCC: 90 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kubusu
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: -/99
End of Project: 10/02
Specifications
Height: 95 metres
Length: 253 metres
Volume of RCC: 364 m3x103
Total volume: 469 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.40 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sutu
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 04/00
End of Project: 03/03
Specifications
Height: 72 metres
Length: 334 metres
Volume of RCC: 284 m3x103
Total volume: 362 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.25 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.79 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.79 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 05/00
End of Project: 08/00
Specifications
Height: 16 metres
Length: 57 metres
Volume of RCC: 331 m3x103
Total volume: 331 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Algeria
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: El Kebir
Reservoir capacity: 963 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 07/00
End of Project: 12/00
Specifications
Height: 118 metres
Length: 714 metres
Volume of RCC: 1690 m3x103
Total volume: 1900 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
82 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
143 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Marite
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: 01/96
Start of RCC: 01/96
End of RCC: 10/00
End of Project: 03/02
Specifications
Height: 53 metres
Length: 350 metres
Volume of RCC: 160 m3x103
Total volume: 327 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.68 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.68 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Apodi
Reservoir capacity: 600 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/00
End of Project: -/01
Specifications
Height: 58 metres
Length: 1660 metres
Volume of RCC: 1023 m3x103
Total volume: 1120 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tiúma
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 01/01
End of Project: 05/01
Specifications
Height: 16 metres
Length: 290 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Taxi
Reservoir capacity: 80 m3x106
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 06/01
End of Project: 10/01
Specifications
Height: 110 metres
Length: 176 metres
Volume of RCC: 188 m3x103
Total volume: 211 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.142 | RCC against formwork (GEVR/GE-RCC) |
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
0.18 | RCC against formwork |
Spillway
Slope | Type |
---|---|
crest | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
93 |
62 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |
110 |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Recreation / Water Supply
River: North Fork Hughes River
Reservoir capacity: 1480 m3x106
Construction Dates
Start of Project: 07/99
Start of RCC: 07/99
End of RCC: 07/01
End of Project: -/01
Specifications
Height: 26 metres
Length: 200 metres
Volume of RCC: 65 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
59 |
107 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
59 | Low-lime flyash (ASTM Class F) |
65 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Chubetu
Reservoir capacity: 93 m3x106
Construction Dates
Start of Project: 03/94
Start of RCC: 03/94
End of RCC: 08/01
End of Project: 03/04
Specifications
Height: 86 metres
Length: 290 metres
Volume of RCC: 523 m3x103
Total volume: 1007 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Ting
Reservoir capacity: 2035 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 11/01
End of Project: 04/02
Specifications
Height: 111 metres
Length: 302 metres
Volume of RCC: 500 m3x103
Total volume: 615 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
82 |
59 48 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
88 88 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Fukuti
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: 12/01
End of Project: 03/03
Specifications
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Congonhas
Reservoir capacity: 800 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 12/01
End of Project: -/02
Specifications
Height: 85 metres
Length: 668 metres
Volume of RCC: 890 m3x103
Total volume: 1030 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dalinghe
Reservoir capacity: 217 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/01
End of Project: -/02
Specifications
Height: 35 metres
Length: 383 metres
Volume of RCC: 87 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
118 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: do Carmo
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/01
Specifications
Height: 42 metres
Length: 2308 metres
Volume of RCC: 655 m3x103
Total volume: 660 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Biliuhe
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/02
Specifications
Height: 50 metres
Length: 267 metres
Volume of RCC: 218 m3x103
Total volume: 233 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
70 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Itapicuru
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 1090 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
34 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
41 | No pozzolan used - |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Pirapama
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 25 metres
Length: 300 metres
Volume of RCC: 87 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | No pozzolan used - |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Curimatá
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 11/02
Specifications
Height: 26 metres
Length: 300 metres
Volume of RCC: 12 m3x103
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 11/98
Start of RCC: 11/98
End of RCC: 01/02
End of Project: 12/02
Specifications
Height: 30 metres
Length: 244 metres
Volume of RCC: 43 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
ogee | RCC against precast concrete blocks [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2000 |
Cementitious material
Cement (kg/m3) |
---|
113 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
113 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Hunting Run
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 01/02
End of Project: 08/02
Specifications
Height: 36 metres
Length: 720 metres
Volume of RCC: 115 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Unformed face of RCC |
Spillway
Slope | Type |
---|---|
Unformed face of RCC |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
74 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
37 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Riachäo
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 06/02
End of Project: -/02
Specifications
Height: 56 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Daishoji
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 12/96
Start of RCC: 12/96
End of RCC: 07/02
End of Project: 03/06
Specifications
Height: 76 metres
Length: 280 metres
Volume of RCC: 188 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Deep
Reservoir capacity: 84 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 07/02
End of Project: 01/03
Specifications
Height: 31 metres
Length: 280 metres
Volume of RCC: 70 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
104 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Xia Oyangxi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/01
Start of RCC: 05/01
End of RCC: 10/02
End of Project: 12/02
Specifications
Height: 45 metres
Length: 118 metres
Volume of RCC: 47 m3x103
Total volume: 49 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
350 | 3500 |
Cementitious material
Cement (kg/m3) |
---|
138 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
113 | Low-lime flyash (ASTM Class F) |
90 |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Escondido Creek
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 10/02
End of Project: 07/03
Specifications
Height: 97 metres
Length: 788 metres
Volume of RCC: 1070 m3x103
Total volume: 1140 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
74 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
121 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Quixeré
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: 11/02
End of Project: -/03
Specifications
Height: 19 metres
Length: 700 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
[stepped face] |
Spillway
Slope | Type |
---|---|
[stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ohkita
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 12/02
End of Project: 03/05
Specifications
Height: 65 metres
Length: 462 metres
Volume of RCC: 270 m3x103
Total volume: 531 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Pasto Velho
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 27 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Xiaoyangxi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 45 metres
Length: 118 metres
Volume of RCC: -
Total volume: 49 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Jordan
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mujib
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/99
Start of RCC: 01/99
End of RCC: 02/03
End of Project: 11/03
Specifications
Height: 67 metres
Length: 490 metres
Volume of RCC: 654 m3x103
Total volume: 694 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Izig
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 11/01
Start of RCC: 11/01
End of RCC: 05/03
End of Project: 01/04
Specifications
Height: 49 metres
Length: 222 metres
Volume of RCC: 50 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Nakatu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 06/03
End of Project: 03/07
Specifications
Height: 139 metres
Length: 424 metres
Volume of RCC: 810 m3x103
Total volume: 1670 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
0.70 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
48 |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Luvuvhu
Reservoir capacity: 164 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 08/03
End of Project: 04/04
Specifications
Height: 47 metres
Length: 392 metres
Volume of RCC: 150 m3x103
Total volume: 316 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
54 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
129 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Water Supply
River: Yangshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/04
Specifications
Height: 39 metres
Length: 176 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 400 m3x106
Construction Dates
Start of Project: 02/01
Start of RCC: 02/01
End of RCC: 04/04
End of Project: 03/05
Specifications
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
20 |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Zamrine
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/03
Start of RCC: 05/03
End of RCC: 09/04
End of Project: 05/05
Specifications
Height: 66 metres
Length: 220 metres
Volume of RCC: 190 m3x103
Total volume: 215 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: João Leite
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: 03/01
Start of RCC: 03/01
End of RCC: -/04
End of Project: -/04
Specifications
Height: 55 metres
Length: 380 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Wu
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 81 metres
Length: 180 metres
Volume of RCC: 105 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 |
Downstream
Slope | Type |
---|---|
0.76 |
Spillway
Slope | Type |
---|---|
0.76 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-aço
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 45 metres
Length: 191 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Paraguaçu
Reservoir capacity: 112 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 320 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: South Fork, Powell River
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: 01/05
End of Project: 07/05
Specifications
Height: 26 metres
Length: 113 metres
Volume of RCC: 11 m3x103
Total volume: 12 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
82 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
82 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Jahgin
Reservoir capacity: 300 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/05
End of Project: 09/07
Specifications
Height: 78 metres
Length: 220 metres
Volume of RCC: 232 m3x103
Total volume: 382 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
105 |
160 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
90 | Natural pozzolan (ASTM Class N) |
90 |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sidu
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: 05/05
End of Project: 10/05
Specifications
Height: 107 metres
Length: 206 metres
Volume of RCC: 166 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
126 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
126 | Low-lime flyash (ASTM Class F) |
103 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Wu
Reservoir capacity: 201 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/06
Specifications
Height: 122 metres
Length: 165 metres
Volume of RCC: 421 m3x103
Total volume: 739 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
95 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation / Water Supply
River: Kido
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/08
Specifications
Height: 94 metres
Length: 350 metres
Volume of RCC: 291 m3x103
Total volume: 501 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Poço do Magro
Reservoir capacity: 32 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 29 metres
Length: 540 metres
Volume of RCC: 58 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daxi
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 71 metres
Length: 243 metres
Volume of RCC: 231 m3x103
Total volume: 244 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: Malaysia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Kinta
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 01/03
Start of RCC: 01/03
End of RCC: 03/06
End of Project: 07/06
Specifications
Height: 90 metres
Length: 792 metres
Volume of RCC: 952 m3x103
Total volume: 975 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/05
Start of RCC: 01/05
End of RCC: 04/06
End of Project: -/06
Specifications
Height: 26 metres
Length: 170 metres
Volume of RCC: 27 m3x103
Total volume: 30 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
Unformed face of RCC |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
95 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
59 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Youjiang
Reservoir capacity: 5660 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 04/06
End of Project: 07/06
Specifications
Height: 130 metres
Length: 720 metres
Volume of RCC: 1995 m3x103
Total volume: 2672 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
80 |
50 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
132 | Low-lime flyash (ASTM Class F) |
110 |

Details
Country: Jordan/ Syria
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Yarmouk
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: 07/06
End of Project: 12/07
Specifications
Height: 103 metres
Length: 485 metres
Volume of RCC: 1426 m3x103
Total volume: 1478 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.60 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
60 | Low-lime flyash (ASTM Class F) |
60 |

Details
Country: Botswana
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: 09/06
End of Project: 05/07
Specifications
Height: 33 metres
Length: 153 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Bear Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/06
Start of RCC: 06/06
End of RCC: 11/06
End of Project: 10/07
Specifications
Height: 29 metres
Length: 168 metres
Volume of RCC: 24 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Okitamano
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: 03/00
Start of RCC: 03/00
End of RCC: 11/06
End of Project: 03/11
Specifications
Height: 126 metres
Length: 381 metres
Volume of RCC: 703 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.50 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.73 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.73 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Venezuela
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: El Guapo
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 08/05
Start of RCC: 08/05
End of RCC: 12/06
End of Project: 08/07
Specifications
Height: 50 metres
Length: 138 metres
Volume of RCC: 320 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.85 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
1.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: -/06
End of Project: 10/06
Specifications
Height: 19 metres
Length: 245 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Mexico
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 30 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Dieshui
Reservoir capacity: 1439 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 351 metres
Volume of RCC: 450 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.25 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
53 |
83 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
99 | Low-lime flyash (ASTM Class F) |
102 |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Hickory Log Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/05
Start of RCC: 10/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 55 metres
Length: 290 metres
Volume of RCC: 165 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
89 |
80 74 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
89 | Low-lime flyash (ASTM Class F) |
98 104 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Hongshui
Reservoir capacity: 16210 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 06/07
End of Project: 12/09
Specifications
Height: 192 metres
Length: 832 metres
Volume of RCC: 4623 m3x103
Total volume: 7400 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.25 |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.68 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
99 |
86 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
121 | Low-lime flyash (ASTM Class F) |
109 |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: R’Mel
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 79 metres
Length: 250 metres
Volume of RCC: 230 m3x103
Total volume: 243 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
100 |
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |

Details
Country: Mongolia
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Zabkhan
Reservoir capacity: 930 m3x106
Construction Dates
Start of Project: 02/05
Start of RCC: 02/05
End of RCC: 06/07
End of Project: 12/07
Specifications
Height: 60 metres
Length: 200 metres
Volume of RCC: 210 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.72 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
333 | 333 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: N’Fis
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 07/07
End of Project: 03/08
Specifications
Height: 71 metres
Length: 233 metres
Volume of RCC: 202 m3x103
Total volume: 216 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tygart Tributory
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: 08/07
End of Project: -/07
Specifications
Height: 39 metres
Length: 204 metres
Volume of RCC: 106 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
59 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
89 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Meander
Reservoir capacity: 43 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 08/07
End of Project: 12/07
Specifications
Height: 47 metres
Length: 180 metres
Volume of RCC: 85 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.70 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.70 | RCC against precast concrete blocks |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kon
Reservoir capacity: 226 m3x106
Construction Dates
Start of Project: 05/02
Start of RCC: 05/02
End of RCC: 12/07
End of Project: 12/08
Specifications
Height: 55 metres
Length: 571 metres
Volume of RCC: 183 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
ogee | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 900 |
Cementitious material
Cement (kg/m3) |
---|
70 |
126 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
175 | Low-lime flyash (ASTM Class F) |
141 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Huotong
Reservoir capacity: 449 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/07
End of Project: -/08
Specifications
Height: 130 metres
Length: 341 metres
Volume of RCC: 681 m3x103
Total volume: 830 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 34 metres
Length: 154 metres
Volume of RCC: 44 m3x103
Total volume: 51 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.80 |
Spillway
Slope | Type |
---|---|
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Lituohe
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 56 metres
Length: 193 metres
Volume of RCC: 162 m3x103
Total volume: 354 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Menghe
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 78 metres
Length: 215 metres
Volume of RCC: 160 m3x103
Total volume: 249 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dongpi
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 04/09
Specifications
Height: 105 metres
Length: 422 metres
Volume of RCC: 485 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.335 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.335 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
72 |
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
108 | Low-lime flyash (ASTM Class F) |
84 |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Khellata
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 07/08
End of Project: 11/08
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 60 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
105 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toppu
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 07/02
Start of RCC: 07/02
End of RCC: 10/08
End of Project: 03/14
Specifications
Height: 78 metres
Length: 309 metres
Volume of RCC: 440 m3x103
Total volume: 530 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Boussiaba
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 11/08
End of Project: 08/09
Specifications
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
112 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
28 | Low-lime flyash (ASTM Class F) |

Details
Country: Mexico
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Presidio
Reservoir capacity: 322 m3x106
Construction Dates
Start of Project: 02/07
Start of RCC: 02/07
End of RCC: -/08
End of Project: -/09
Specifications
Height: 85 metres
Length: 256 metres
Volume of RCC: 85 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
0.15 | Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
0.85 | Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
50 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | Ground-granulated blast-furnace slag |

Details
Country: Oman
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Wadi Dayqah
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 08/06
Start of RCC: 08/06
End of RCC: 04/09
End of Project: 11/09
Specifications
Height: 75 metres
Length: 410 metres
Volume of RCC: 590 m3x103
Total volume: 650 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
126 |
112 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
54 | Milled sand |
48 |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Bear Creek
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 05/09
End of Project: 06/09
Specifications
Height: 27 metres
Length: 292 metres
Volume of RCC: 60 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
77 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
77 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kase
Reservoir capacity: 71 m3x106
Construction Dates
Start of Project: 02/05
Start of RCC: 02/05
End of RCC: 06/09
End of Project: 03/12
Specifications
Height: 99 metres
Length: 456 metres
Volume of RCC: 830 m3x103
Total volume: 948 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Deep Creek
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: 12/09
End of Project: 07/10
Specifications
Height: 22 metres
Length: 226 metres
Volume of RCC: 39 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
89 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Fu
Reservoir capacity: 572 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: -/09
End of Project: -/10
Specifications
Height: 120 metres
Length: 631 metres
Volume of RCC: 1151 m3x103
Total volume: 1580 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: de Contas
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/09
End of Project: -/10
Specifications
Height: 18 metres
Length: 337 metres
Volume of RCC: 61 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Xijiang
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/09
End of Project: -/12
Specifications
Height: 74 metres
Length: 190 metres
Volume of RCC: 230 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tuochang
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/09
Specifications
Height: 58 metres
Length: 168 metres
Volume of RCC: -
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tijuco
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 03/10
Specifications
Height: 16 metres
Length: 156 metres
Volume of RCC: 13 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Parnaiba
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 48 metres
Length: 870 metres
Volume of RCC: 293 m3x103
Total volume: 306 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Claro
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/09
End of Project: 07/10
Specifications
Height: 60 metres
Length: 1670 metres
Volume of RCC: 172 m3x103
Total volume: 282 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Tongzhi
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 68 metres
Length: 153 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sehb el Merga
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 37 metres
Length: 480 metres
Volume of RCC: 85 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
25 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Çine
Reservoir capacity: 350 m3x106
Construction Dates
Start of Project: 12/95
Start of RCC: 12/95
End of RCC: 04/10
End of Project: 10/11
Specifications
Height: 137 metres
Length: 300 metres
Volume of RCC: 1560 m3x103
Total volume: 1650 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | RCC against precast concrete panels (GEVR/GE-RCC) |
0.20 |
Downstream
Slope | Type |
---|---|
0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
105 | Low-lime flyash (ASTM Class F) |
95 |

Details
Country: Malaysia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Batu Hampar
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: 04/10
End of Project: 05/10
Specifications
Height: 65 metres
Length: 236 metres
Volume of RCC: 200 m3x103
Total volume: 203 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
RCC against precast concrete blocks |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |

Details
Country: Malaysia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Sungai Bengoh
Reservoir capacity: 144 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 05/10
End of Project: -/12
Specifications
Height: 63 metres
Length: 267 metres
Volume of RCC: 130 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kajoo
Reservoir capacity: 207 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 08/10
End of Project: 11/10
Specifications
Height: 65 metres
Length: 350 metres
Volume of RCC: 265 m3x103
Total volume: 437 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
RCC against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
98 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
42 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Al Mal
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 09/10
End of Project: 04/11
Specifications
Height: 75 metres
Length: 408 metres
Volume of RCC: 415 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
73 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
32 | Natural pozzolan (ASTM Class N) |

Details
Country: Argentina
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Quinto
Reservoir capacity: -
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 09/10
End of Project: 01/11
Specifications
Height: 79 metres
Length: 487 metres
Volume of RCC: 210 m3x103
Total volume: 249 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
Traditional concrete against precast concrete panels |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Teviot Brook
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/09
Start of RCC: 09/09
End of RCC: 12/10
End of Project: 06/11
Specifications
Height: 48 metres
Length: 464 metres
Volume of RCC: 173 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
85 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: 10/10
Specifications
Height: 28 metres
Length: 1000 metres
Volume of RCC: -
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Pajeú
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: 566 metres
Volume of RCC: 64 m3x103
Total volume: 92 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ain Leuh
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 01/11
End of Project: 10/11
Specifications
Height: 29 metres
Length: 136 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Natural pozzolan (ASTM Class N) |

Details
Country: Argentina
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Las Tunas
Reservoir capacity: 101 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 02/11
End of Project: 12/11
Specifications
Height: 33 metres
Length: 259 metres
Volume of RCC: 30 m3x103
Total volume: 56 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
200 | 400 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
25 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Yunishi
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: 05/11
End of Project: 09/12
Specifications
Height: 119 metres
Length: 320 metres
Volume of RCC: 967 m3x103
Total volume: 1053 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Yubari
Reservoir capacity: 427 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 09/11
End of Project: 03/15
Specifications
Height: 111 metres
Length: 390 metres
Volume of RCC: 584 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.82 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.82 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 & |
1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Lusixi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 39 metres
Length: 140 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Hezil
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 89 metres
Length: 356 metres
Volume of RCC: 718 m3x103
Total volume: 752 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
81 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | No pozzolan used - |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Navigation / Water Supply
River: Honghe
Reservoir capacity: 552 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 108 metres
Length: 353 metres
Volume of RCC: -
Total volume: 987 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: -
Volume of RCC: 20 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: -
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tiyoughza
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 32 metres
Length: -
Volume of RCC: 45 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
120 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Vaitarna
Reservoir capacity: 202 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 04/12
End of Project: -/12
Specifications
Height: 102 metres
Length: 565 metres
Volume of RCC: 1202 m3x103
Total volume: 1500 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
145 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: San Diego
Reservoir capacity: 299 m3x106
Construction Dates
Start of Project: 06/09
Start of RCC: 06/09
End of RCC: 09/12
End of Project: 09/14
Specifications
Height: 103 metres
Length: 474 metres
Volume of RCC: 459 m3x103
Total volume: 465 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
86 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
127 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Cotter
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 12/12
End of Project: 08/13
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 369 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
96 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
96 | Low-lime flyash (ASTM Class F) |
90 |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Marrecas
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: -/12
End of Project: 12/12
Specifications
Height: 35 metres
Length: 430 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 15 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Mooi
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: 03/11
Start of RCC: 03/11
End of RCC: 05/13
End of Project: 05/14
Specifications
Height: 39 metres
Length: 300 metres
Volume of RCC: 96 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
50 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Steelpoort
Reservoir capacity: 347 m3x106
Construction Dates
Start of Project: 07/07
Start of RCC: 07/07
End of RCC: 11/13
End of Project: 03/14
Specifications
Height: 85 metres
Length: 1015 metres
Volume of RCC: 769 m3x103
Total volume: 1012 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
62 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
145 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: E’erqisi
Reservoir capacity: 2419 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/13
End of Project: -/14
Specifications
Height: 122 metres
Length: 1489 metres
Volume of RCC: 2520 m3x103
Total volume: 2890 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Muli
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/14
Specifications
Height: 132 metres
Length: 211 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Mexico
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tecolotán
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 01/11
Start of RCC: 01/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 78 metres
Length: 440 metres
Volume of RCC: 496 m3x103
Total volume: 561 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Vertical |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Braço do Norte
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/13
Specifications
Height: 21 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Bembo
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: 02/14
End of Project: 11/14
Specifications
Height: 69 metres
Length: 210 metres
Volume of RCC: 162 m3x103
Total volume: 202 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
80 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Cheshmeh Ashegh
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: 05/14
End of Project: 03/17
Specifications
Height: 60 metres
Length: 375 metres
Volume of RCC: 130 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 600 - |
900 |
Cementitious material
Cement (kg/m3) |
---|
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
80 | Natural pozzolan (ASTM Class N) |

Details
Country: South Korea
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Hantan
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 07/14
End of Project: 12/14
Specifications
Height: 84 metres
Length: 690 metres
Volume of RCC: 650 m3x103
Total volume: 709 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Lesotho
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: South Phuthiatsana
Reservoir capacity: 64 m3x106
Construction Dates
Start of Project: 09/11
Start of RCC: 09/11
End of RCC: 11/14
End of Project: 04/15
Specifications
Height: 83 metres
Length: 278 metres
Volume of RCC: 280 m3x103
Total volume: 314 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
145 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Iriri
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/14
End of Project: -/15
Specifications
Height: 84 metres
Length: 202 metres
Volume of RCC: 270 m3x103
Total volume: 380 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 41 metres
Length: 271 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.73 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
conduit |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2000 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 303 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 66 metres
Length: 1015 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 72 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Naka
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 07/15
End of Project: 03/18
Specifications
Height: 103 metres
Length: 556 metres
Volume of RCC: 634 m3x103
Total volume: 935 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
1.00 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
104 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
26 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: -
Type: Arch-Gravity
Purpose(s): Irrigation / Water Supply
River: Djen Djen
Reservoir capacity: 294 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: 08/15
End of Project: 12/15
Specifications
Height: 121 metres
Length: 366 metres
Volume of RCC: 975 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Duck
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 01/14
Start of RCC: 01/14
End of RCC: 09/15
End of Project: -/16
Specifications
Height: 41 metres
Length: 90 metres
Volume of RCC: 121 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
RCC against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork (GEVR/GE-RCC) [stepped face] |
RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
107 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
55 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 61 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Serbia
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Cmi Timok
Reservoir capacity: 48 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 54 metres
Length: 396 metres
Volume of RCC: 175 m3x103
Total volume: 305 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sarma
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/13
Start of RCC: 01/13
End of RCC: 10/16
End of Project: -/17
Specifications
Height: 66 metres
Length: 148 metres
Volume of RCC: 85 m3x103
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Lebanon
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Boqaata
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 07/12
Start of RCC: 07/12
End of RCC: 12/16
End of Project: 12/21
Specifications
Height: 72 metres
Length: 222 metres
Volume of RCC: 200 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
0.80 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/16
Specifications
Height: 18 metres
Length: 196 metres
Volume of RCC: 52 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kelebek
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 62 metres
Length: 193 metres
Volume of RCC: 74 m3x103
Total volume: 97 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ormanlik
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: 10/17
Specifications
Height: 49 metres
Length: 265 metres
Volume of RCC: 114 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: -
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 26 metres
Length: 500 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Camibogazi
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 50 metres
Length: 295 metres
Volume of RCC: 142 m3x103
Total volume: 173 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
98 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
52 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: w
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 54 metres
Length: 246 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Jordan
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge / Water Supply
River: Ibn Hammad
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: 07/17
End of Project: -/22
Specifications
Height: 56 metres
Length: 160 metres
Volume of RCC: 160 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.30 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cidacos
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 07/17
End of Project: 09/18
Specifications
Height: 103 metres
Length: 376 metres
Volume of RCC: 695 m3x103
Total volume: 765 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
140 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mellegue
Reservoir capacity: 155 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/17
End of Project: -/18
Specifications
Height: 51 metres
Length: 900 metres
Volume of RCC: 245 m3x103
Total volume: 320 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.90 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.90 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Argentina
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Albigasta
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/17
End of Project: -/19
Specifications
Height: 64 metres
Length: 380 metres
Volume of RCC: -
Total volume: 279 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 58 metres
Length: 269 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Çırçıp
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/17
Specifications
Height: 36 metres
Length: 110 metres
Volume of RCC: 20 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ximihe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 88 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Mulenghe
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 46 metres
Length: 406 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dashahe
Reservoir capacity: 196 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 74 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Mabiehe
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 108 metres
Length: 182 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Harai
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/14
Start of RCC: 07/14
End of RCC: 03/18
End of Project: 03/19
Specifications
Height: 81 metres
Length: 295 metres
Volume of RCC: 372 m3x103
Total volume: 419 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.77 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.77 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Shangcunxi
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/18
End of Project: -/19
Specifications
Height: 89 metres
Length: 338 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Venezuela
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Cuira
Reservoir capacity: -
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: -/19
Specifications
Height: 135 metres
Length: -
Volume of RCC: 1700 m3x103
Total volume: 1950 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Colonia
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 09/15
Start of RCC: 09/15
End of RCC: -/18
End of Project: 09/18
Specifications
Height: 21 metres
Length: 195 metres
Volume of RCC: 30 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shizhe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 44 metres
Length: 49 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Melen
Reservoir capacity: 693 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: 03/19
End of Project: 05/19
Specifications
Height: 124 metres
Length: 944 metres
Volume of RCC: 1871 m3x103
Total volume: 2096 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
60 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Agatsuma
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 05/19
End of Project: 10/19
Specifications
Height: 116 metres
Length: 291 metres
Volume of RCC: -
Total volume: 911 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.08 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 06/19
End of Project: -/20
Specifications
Height: 55 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ayvali
Reservoir capacity: 988 m3x106
Construction Dates
Start of Project: 06/14
Start of RCC: 06/14
End of RCC: 08/19
End of Project: 11/19
Specifications
Height: 43 metres
Length: 157 metres
Volume of RCC: 37 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
66 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
44 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Uludere
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/17
Start of RCC: 03/17
End of RCC: 09/19
End of Project: 08/20
Specifications
Height: 52 metres
Length: 122 metres
Volume of RCC: 55 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Suludere
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/16
Start of RCC: 03/16
End of RCC: 09/19
End of Project: 10/19
Specifications
Height: 69 metres
Length: 212 metres
Volume of RCC: 130 m3x103
Total volume: 185 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Taquarembó
Reservoir capacity: -
Construction Dates
Start of Project: 05/08
Start of RCC: 05/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 33 metres
Length: 330 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Afghanistan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shakardar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/19
End of Project: 04/21
Specifications
Height: 78 metres
Length: 303 metres
Volume of RCC: 270 m3x103
Total volume: 337 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
105 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation / Water Supply
River: Gharanghou
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 44 metres
Length: 352 metres
Volume of RCC: 106 m3x103
Total volume: 147 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 1089 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/19
End of Project: -/21
Specifications
Height: 163 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|