SEARCHING
... please wait

Hongkou

< Back to search results

Download PDF data sheet
Hongkou completed
Hongkou completed

Particulars

Owner: Fujian Hongkou Hydropower Co. Ltd.

Designer: Fujian Institute of Investigation and Design of Hydropower

Contractor: Fujian (Minjiang) Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower / Water Supply

Reservoir capacity: 449 m3x106

Height: 130 metres

Length: 341 metres

Volume of RCC: 681 m3x103

Total volume: 830 m3x103

Construction Dates

Start of Project: —/03 (— 2003)

Start of RCC: —/05 (— 2005)

End of RCC: —/07 (— 2007)

End of Project: —/08 (— 2008)

Country: China

River: Huotong

DMS Co-ordinates: 26˚53'36.58"N, 119˚19'40.69"E

DD Co-ordinates: 26.893494, 119.32814

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type