Assif Ouender

Download PDF data sheet
Photo coming soon

Particulars

Owner: AREP (Regional Project Execution Agency)

Designer: Novec

Contractor: STAM (Société des travaux agricoles du Maroc)

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Recreation / Water Supply

Reservoir capacity: 15 m3x106

Height: 45 metres

Length: 300 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: 11/23 (November 2023)

Start of RCC: /25 ( 2025)

End of RCC: 03/26 (March 2026)

End of Project: 06/26 (June 2026)

Country: Morocco

River: Assif Ouender

DMS Co-ordinates: 29˚21'57.34"N, 10˚8'32.19"W

DD Co-ordinates: 29.365929, -10.142275