Ayvali
Download PDF data sheet
Particulars
Owner: unknown
Designer: Su Yapi Engineering and Consulting Inc.
Contractor: Özkar Construction and Trade
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 308 m3x106
Height: 177 metres
Length: 405 metres
Volume of RCC: 1650 m3x103
Total volume: 1900 m3x103
Construction Dates
Start of Project: 04/11 (April 2011)
Start of RCC: 02/13 (February 2013)
End of RCC: 02/15 (February 2015)
End of Project: 10/15 (October 2015)
Country: Turkey
River: Oltu
DMS Co-ordinates: 40˚46'6"N, 41˚55'49"E
DD Co-ordinates: 40.768333, 41.930279
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
50 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |
120 |