Bab Louta
Download PDF data sheet
Bab Louta completed

Particulars
Owner: unknown
Designer: Ingema
Contractor: Direction des Aménagements Hydrauliques
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 37 m3x106
Height: 54 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Dates
Start of Project: 01/97 (January 1997)
Start of RCC: 02/98 (February 1998)
End of RCC: 02/99 (February 1999)
End of Project: 03/99 (March 1999)
Country: Morocco
River: Bous Sbaa
DMS Co-ordinates: 34˚0'54.24"N, 4˚20'0.80"W
DD Co-ordinates: 34.015068, -4.333556
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |
