Baxiang Nº3
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Insitute of Investigation and Design for Hydropower Projects, Guangdong Province
Contractor: Guangdong 2nd Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 8 m3x106
Height: 44 metres
Length: 207 metres
Volume of RCC: 63 m3x103
Total volume: 83 m3x103
Construction Dates
Start of Project: —/05 (— 2005)
Start of RCC: —/06 (— 2006)
End of RCC: —/07 (— 2007)
End of Project: —/08 (— 2008)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
