Belén-Flores
Download PDF data sheet
Particulars
Owner: unknown
Designer: Confederacion Hidrografica del Sur
Contractor: SACYR
Statistics
Type: Gravity
Purpose(s): Flood Control
Reservoir capacity: 1 m3x106
Height: 28 metres
Length: 87 metres
Volume of RCC: 10 m3x103
Total volume: 12 m3x103
Construction Dates
Start of Project: 09/91 (September 1991)
Start of RCC: 11/91 (November 1991)
End of RCC: 01/92 (January 1992)
End of Project: 01/92 (January 1992)
Country: Spain
River: Belén
DMS Co-ordinates: 36˚52'21.98"N, 2˚30'23.85"W
DD Co-ordinates: 36.872772, -2.506625
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
73 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
109 | Low-lime flyash (ASTM Class F) |