SEARCHING
... please wait

Boqueron

Download PDF data sheet
Boqueron completed
Boqueron completed

Particulars

Owner: unknown

Designer: SYNCOLSULT

Contractor: Ferrovial

Statistics

Type: Gravity

Purpose(s): Flood Control

Reservoir capacity: 13 m3x106

Height: 58 metres

Length: 290 metres

Volume of RCC: 137 m3x103

Total volume: 145 m3x103

Construction Dates

Start of Project: 10/94 (October 1994)

Start of RCC: 02/96 (February 1996)

End of RCC: 08/96 (August 1996)

End of Project: 12/97 (December 1997)

Country: Spain

River: Rambla del Boqueron

DMS Co-ordinates: 38˚31'19.6"N, 1˚45'44.55"W

DD Co-ordinates: 38.52211, -1.762375

Facings

Upstream

SlopeType
0.05RCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.73RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.73RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)