Çetintepe
Download PDF data sheet
Photo coming soon

Particulars
Owner: DSI - State Hydraulic Works
Designer: Hidro Dizayn Engineering Consultancy Co. Inc.
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 12 m3x106
Height: 39 metres
Length: 173 metres
Volume of RCC: 60 m3x103
Total volume: 64 m3x103
Construction Dates
Start of Project: 09/08 (September 2008)
Start of RCC: —/11 (— 2011)
End of RCC: —/12 (— 2012)
End of Project: —/13 (— 2013)
Country: Turkey
River: Robozik
DMS Co-ordinates: 37˚22'10"N, 42˚56'19"E
DD Co-ordinates: 37.369446, 42.938610
Facings
Upstream
Slope | Type |
---|---|
0.10 | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
95 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |