SEARCHING
... please wait

El Esparragal

Download PDF data sheet
El Esparragal completed
El Esparragal completed

Particulars

Owner: unknown

Designer: Manuel Gonzalez Sereno (ATE)

Contractor: Ferrovial - Agroman/Sando J.V.

Statistics

Type: Gravity

Purpose(s): Environmental

Reservoir capacity: 5 m3x106

Height: 21 metres

Length: 383 metres

Volume of RCC: 62 m3x103

Total volume: 89 m3x103

Construction Dates

Start of Project: /02 ( 2002)

Start of RCC: 05/03 (May 2003)

End of RCC: 08/03 (August 2003)

End of Project: 03/04 (March 2004)

Country: Spain

River: Viar

DMS Co-ordinates: 37˚48'26.54"N, 5˚54'56.13"W

DD Co-ordinates: 37.807373, -5.915592

Facings

Upstream

SlopeType
0.30RCC against formwork (GEVR/GE-RCC)  [stepped face]

Downstream

SlopeType
0.90RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.90RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
157Low-lime flyash (ASTM Class F)