Güllübag
Download PDF data sheet
Güllübag completed

Particulars
Owner: unknown
Designer: CNR Müsavirlik
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 21 m3x106
Height: 72 metres
Length: 97 metres
Volume of RCC: 160 m3x103
Total volume: 175 m3x103
Construction Dates
Start of Project: 05/09 (May 2009)
Start of RCC: 02/11 (February 2011)
End of RCC: 06/11 (June 2011)
End of Project: 02/12 (February 2012)
Country: Turkey
River: Çoruh
DMS Co-ordinates: 40˚31'18.16"N, 41˚01'17.49"E
DD Co-ordinates: 40.521709, 41.021526
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |
