Guoduo
Download PDF data sheet
Guoduo completed

Particulars
Owner: unknown
Designer: Hydrochina Guiyang Engineering Corporation
Contractor: SinoHydro Construction Bureau Nº7 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 83 m3x106
Height: 93 metres
Length: 236 metres
Volume of RCC: unknown
Total volume: 550 m3x103
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/13 (— 2013)
End of RCC: —/15 (— 2015)
End of Project: —/16 (— 2016)
Country: China
River: Zaqu
DMS Co-ordinates: 31˚31'51.6"N, 97˚11'24"E
DD Co-ordinates: 31.531, 97.190002
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|