Guxian
Download PDF data sheet
Particulars
Owner: unknown
Designer: Yellow River Engineering Consulting Co., Ltd.
Contractor: 11th Construction Bureau (now SinoHydro)
Statistics
Type: unknown
Purpose(s): unknown
Reservoir capacity: 1175 m3x106
Height: 125 metres
Length: 315 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/78 (— 1978)
Start of RCC: —/89 (— 1989)
End of RCC: —/93 (— 1993)
End of Project: —/95 (— 1995)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|