Huhehaote (Hohhot) PSS - Upstream lower dam
Download PDF data sheet
Huhehaote (Hohhot) PSS - Upstream lower dam on Google Earth

Particulars
Owner: unknown
Designer: Beijing Institute of Investigation and Design for Hydropower Projects
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 7 m3x106
Height: 69 metres
Length: 242 metres
Volume of RCC: 185 m3x103
Total volume: 330 m3x103
Construction Dates
Start of Project: —/07 (— 2007)
Start of RCC: —/09 (— 2009)
End of RCC: —/11 (— 2011)
End of Project: —/12 (— 2012)
Country: China
River: Halasxinegou
DMS Co-ordinates: 40˚59'27.19"N, 111˚41'7.84"E
DD Co-ordinates: 40.990887, 111.685509