Imboulou
Download PDF data sheet
Imboulou completed

Particulars
Owner: unknown
Designer: Fichtner
Contractor: CMEC (China National Machinery and Equipment Import and Export Corporation)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 584 m3x106
Height: 33 metres
Length: 310 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 09/03 (September 2003)
Start of RCC: —/08 (— 2008)
End of RCC: —/10 (— 2010)
End of Project: 05/11 (May 2011)
Country: Republic of Congo
River: Léfini
DMS Co-ordinates: 2˚56'5"S, 16˚7'40"E
DD Co-ordinates: -2.934722, 16.127777
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
