Kagong
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 81 m3x106
Height: 97 metres
Length: 237 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/13 (— 2013)
Start of RCC: —/15 (— 2015)
End of RCC: —/17 (— 2017)
End of Project: —/19 (— 2019)
Country: China
River: Lancang
DMS Co-ordinates: 30˚37'21.24"N, 97˚26'39.9"E
DD Co-ordinates: 30.622566, 97.44442
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
