Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 9 m3x106
Height: 69 metres
Length: unknown
Volume of RCC: 130 m3x103
Total volume: 185 m3x103
Construction Dates
Start of Project: 03/16 (March 2016)
Start of RCC: 03/17 (March 2017)
End of RCC: 04/19 (April 2019)
End of Project: 12/19 (December 2019)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | Low-lime flyash (ASTM Class F) |