SEARCHING
... please wait

Karamürsel Tepeköy

< Back to search results

Download PDF data sheet
Photo coming soon

Particulars

Owner: DSI - State Hydraulic Works

Designer: unknown

Contractor: Şaban Çetin Türkoglu

Statistics

Type: Hardfill

Purpose(s): Irrigation

Reservoir capacity: 1 m3x106

Height: 19 metres

Length: 170 metres

Volume of RCC: 240 m3x103

Total volume: unknown

Construction Dates

Start of Project: /14 ( 2014)

Start of RCC: /15 ( 2015)

End of RCC: /16 ( 2016)

End of Project: /16 ( 2016)

Country: Turkey

River: Uzundere

DMS Co-ordinates: 40˚40'49.56"N, 29˚39'47.79"E

DD Co-ordinates: 40.680431, 29.663277

Facings

Upstream

SlopeType
0.10Traditional concrete against formwork

Downstream

SlopeType
0.70Traditional concrete against formwork

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
48Low-lime flyash (ASTM Class F)