Lur Berria
Download PDF data sheet
Particulars
Owner: unknown
Designer: ISL
Contractor: Vinci Construction Terrassement
Statistics
Type: Gravity
Purpose(s): Flood Control
Reservoir capacity: 4 m3x106
Height: 22 metres
Length: 168 metres
Volume of RCC: unknown
Total volume: 190 m3x103
Construction Dates
Start of Project: —/06 (— 2006)
Start of RCC: —/07 (— 2007)
End of RCC: —/07 (— 2007)
End of Project: —/08 (— 2008)
Country: France
River: Nivelle
DMS Co-ordinates: 43˚18'48.54"N, 01˚31'59.01"W
DD Co-ordinates: 43.313484, -1.533058
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|