SEARCHING
... please wait

Mae Suai

Download PDF data sheet
Mae Suai completed
Mae Suai completed

Particulars

Owner: unknown

Designer: Coyne et Bellier - Team Consulting Engineers

Contractor: Sisaeng Construction Co. Ltd. and China National Water Resource and Hydropower Engineering Corp. JV

Statistics

Type: Gravity

Purpose(s): Irrigation

Reservoir capacity: 73 m3x106

Height: 59 metres

Length: 340 metres

Volume of RCC: 300 m3x103

Total volume: 350 m3x103

Construction Dates

Start of Project: 11/99 (November 1999)

Start of RCC: 10/00 (October 2000)

End of RCC: 01/02 (January 2002)

End of Project: 07/02 (July 2002)

Country: Thailand

River: Mae Suai

DMS Co-ordinates: 19˚40'51.02"N, 99˚32'12.05"E

DD Co-ordinates: 19.68084, 99.536682

Facings

Upstream

SlopeType
0.15RCC supported by fill shoulders

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
80  toLow-lime flyash (ASTM Class F)