Mae Suai
Download PDF data sheet
Particulars
Owner: unknown
Designer: Coyne et Bellier - Team Consulting Engineers
Contractor: Sisaeng Construction Co. Ltd. and China National Water Resource and Hydropower Engineering Corp. JV
Statistics
Type: Gravity
Purpose(s): Irrigation
Reservoir capacity: 73 m3x106
Height: 59 metres
Length: 340 metres
Volume of RCC: 300 m3x103
Total volume: 350 m3x103
Construction Dates
Start of Project: 11/99 (November 1999)
Start of RCC: 10/00 (October 2000)
End of RCC: 01/02 (January 2002)
End of Project: 07/02 (July 2002)
Country: Thailand
River: Mae Suai
DMS Co-ordinates: 19˚40'51.02"N, 99˚32'12.05"E
DD Co-ordinates: 19.68084, 99.536682
Facings
Upstream
Slope | Type |
---|---|
0.15 | RCC supported by fill shoulders |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
80 to | Low-lime flyash (ASTM Class F) |