Middle Yeywa
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 453 m3x106
Height: 160 metres
Length: 244 metres
Volume of RCC: 1700 m3x103
Total volume: unknown
Construction Dates
Start of Project: 17/00 ( 2000)
Start of RCC: —/19 (— 2019)
End of RCC: —/23 (— 2023)
End of Project: —/25 (— 2025)
Country: Myanmar
River: Myitnge
DMS Co-ordinates: 21˚57'40"N, 96˚52'53"E
DD Co-ordinates: 21.961111, 96.881386
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|