Nam Leuk spillway
Download PDF data sheet
Photo coming soon

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 15 metres
Length: 60 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/98 (— 1998)
Start of RCC: —/98 (— 1998)
End of RCC: —/99 (— 1999)
End of Project: —/00 (— 2000)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|