Nam Ngum 4
Download PDF data sheet
Particulars
Owner: unknown
Designer: Artelia
Contractor: China National Heavy Machinery Co.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 74 metres
Length: 252 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 02/18 (February 2018)
Start of RCC: —/21 (— 2021)
End of RCC: —/23 (— 2023)
End of Project: —/24 (— 2024)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|