Pine Brook
Download PDF data sheet
Particulars
Owner: unknown
Designer: TCB Inc
Contractor: AST RCC Inc
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 1 m3x106
Height: 26 metres
Length: 170 metres
Volume of RCC: 27 m3x103
Total volume: 30 m3x103
Construction Dates
Start of Project: 01/05 (January 2005)
Start of RCC: 10/05 (October 2005)
End of RCC: 04/06 (April 2006)
End of Project: —/06 (— 2006)
Country: USA
River: unknown
DMS Co-ordinates: 40˚02'57.63"N, 105˚18'44.63"W
DD Co-ordinates: 40.049343, -105.312393
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
Unformed face of RCC |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
95 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
59 | Low-lime flyash (ASTM Class F) |