Sfeissif
Download PDF data sheet
Sfeissif completed

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): unknown
Reservoir capacity: 20 m3x106
Height: 29 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/08 (— 2008)
Start of RCC: —/09 (— 2009)
End of RCC: —/10 (— 2010)
End of Project: —/11 (— 2011)
Country: Morocco
River: Safsaf
DMS Co-ordinates: 32˚20'9.8"N, 1˚20'45.3"W
DD Co-ordinates: 32.336056, -1.345917
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used - |
