Smithland
Download PDF data sheet
Smithland completed

Statistics
Type: Hardfill
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 33 metres
Length: 153 metres
Volume of RCC: 120 m3x103
Total volume: unknown
Construction Dates
Start of Project: 12/11 (December 2011)
Start of RCC: 03/14 (March 2014)
End of RCC: 10/14 (October 2014)
End of Project: 07/17 (July 2017)
Country: USA
River: Ohio
DMS Co-ordinates: 37˚10'12.13"N, 88˚25'6.29"W
DD Co-ordinates: 37.170036, -88.418411
Facings
Upstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
230 | 230 |
Cementitious material
Cement (kg/m3) |
---|
118 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
64 | Low-lime flyash (ASTM Class F) |