Teesta low dam (Stage IV)
Download PDF data sheet
Teesta low dam (Stage IV) completed

Particulars
Owner: unknown
Designer: NHPC Ltd.
Contractor: Hindustan Construction Co. Ltd., Mumbai
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 37 m3x106
Height: 45 metres
Length: 196 metres
Volume of RCC: 167 m3x103
Total volume: 170 m3x103
Construction Dates
Start of Project: 05/06 (May 2006)
Start of RCC: 01/13 (January 2013)
End of RCC: 05/15 (May 2015)
End of Project: 08/16 (August 2016)
Country: India
River: Teesta
DMS Co-ordinates: 26˚55'41.17"N, 88˚27'15.97"E
DD Co-ordinates: 26.928102, 88.454437
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |