Tiechuanqiao
Download PDF data sheet![Tiechuanqiao under construction Tiechuanqiao under construction](/site/assets/files/38071/rccdam0485uc.0x300.jpg)
Tiechuanqiao under construction
![Tiechuanqiao under construction Tiechuanqiao under construction](/site/assets/files/38071/rccdam0485uc.0x300.jpg)
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Thin Arch
Purpose(s): unknown
Reservoir capacity: 25 m3x106
Height: 95 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/07 (— 2007)
Start of RCC: —/08 (— 2008)
End of RCC: —/10 (— 2010)
End of Project: —/11 (— 2011)