Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Langshan [A] | China | Dinggeniu | 33 | - /74 | - /76 | - /78 | - /79 | 41 | ||||||||||||||||
Liangsanping [A] | China | Sixian Water Resources Bureau | H | Leishui | 4 | - /79 | - /80 | - /81 | - /82 | 35 | 33 | 3 | 3 | |||||||||||
Maoeryan [A] | China | Shiqi | 33 | - /68 | - /88 | - /91 | - /93 | 35 | ||||||||||||||||
Puding [A] | China | Guizhou Qianyuan Power Co. Ltd. | H I W | Sanchahe | 377 | 03/89 | 06/92 | 05/93 | 02/94 | 75 | 196 | 103 | 137 | V | (1) | 0.35 | (1) | ogee 0.35 | (1) (1) | 300 | 300 | 85 54 | 103 99 | (F) |
Wenquanbao [A] | China | Reservoir Management Office | F H I W | Tanghe | 7 | 10/91 | 10/92 | 06/94 | - /95 | 48 | 188 | 55 | 63 | V | (4) | 0.30 | (3) | ogee | (13) | 300 | 300 | 110 69 | 68 85 | (F) |
Maojiang [A] | China | Lanshan County Hydropower Bureau | H I | Xiang | 2 | - /92 | - /93 | - /94 | - /95 | 45 | 150 | 45 | (F) | |||||||||||
Sishanping [A] | China | Huangcen Reservoir Management Office | F H I | Leishui | 3 | - /92 | - /93 | - /94 | - /95 | 56 | 147 | 18 | (F) | |||||||||||
Fengxiangxia [A] | China | Fengdu Hydropower Bureau | H | Huilonghe | 8 | - /93 | - /95 | - /97 | - /98 | 90 | 158 | 770 | 0.10 | 0.76 | 0.76 | |||||||||
Wajin [A] | China | Fushan Power Station Management Bureau | H I | Nanxi | 7 | - /94 | - /96 | - /98 | - /99 | 47 | 235 | 240 | ||||||||||||
Kengxiashan [A] | China | Wencheng County Kengxiashan Hydropower Development Co. Ltd. | H | Yuquanxi | 1 | - /96 | - /97 | - /98 | - /98 | 34 | 80 | |||||||||||||
Shankou Nº3 [A] | China | Shixing County Power Development Corporation | F H | Du’anshui (Chengjiang) | 48 | 09/99 | 02/00 | 01/01 | 03/01 | 57 | 179 | 90 | 119 | V | (3') | 0.75 | (3') | 0.80 | (1) | 330 | 3000 | 105 63 | 86 80 | (F) |
Shimenzi [A] | China | Shimenzi Reservoir Engineering Management Office | H I W | Taxi | 80 | 06/98 | 06/99 | 06/01 | 10/01 | 110 | 176 | 188 | 211 | 0.142 V | (3') (3') | V 0.18 | (3) (3) | crest | (12) | 300 | 3000 | 93 62 | 110 110 | (F) |
Shuangkengkou [A] | China | H | Xiaoxihe | 12 | - /99 | - /00 | - /01 | - /02 | 68 | |||||||||||||||
Shapai [A] | China | Sichuan Minjiang Hydropower Co. Ltd. | H | Caopohe | 18 | 06/97 | 03/00 | 05/02 | 04/03 | 132 | 230 | 380 | 392 | V 0.10 | (3') | 0.21 | (3) | crest 0.21 | (1) | 300 | 300 | 108 89 | 72 89 | (F) |
Nankengyuan [A] | China | H | Xiaoxihe | 1 | - /98 | - /00 | - /02 | - /03 | 34 | 114 | ||||||||||||||
Junxi II [A] | China | County Bureau of Hydropower | H | Junxi | 6 | - /00 | - /01 | - /02 | - /03 | 69 | 192 | |||||||||||||
Linhekou [A] | China | Shaanxi Lan River Hydropower Development Corporation | H I | Linhe | 147 | - /99 | 12/01 | 06/03 | - /04 | 100 | 311 | 229 | 293 | curve | (3') | curve | (3') | ogee | (1) | 300 | 3000 | 74 66 | 111 111 | (F) |
Maobaguan [A] | China | Shanxi Hanjiang Hydropower Development Co. Ltd. | H | Renhe | 2 | - /00 | - /02 | - /03 | - /04 | 66 | 120 | 81 | 106 | |||||||||||
Shanggou [A] | China | Xifeng County Water Conservancy Bureau | W | Yangshui | 1 | - /01 | - /02 | - /03 | - /04 | 39 | 176 | |||||||||||||
Liubo [A] | China | Anhui Hydropower Development Co. Ltd., | F H | Xipihe | 51 | - /02 | - /03 | - /03 | - /04 | 70 | 258 | 130 | 168 | (F) | ||||||||||
Xuanmiaoguan [A] | China | - /00 | - /02 | - /04 | - /05 | 66 | 191 | 66 | ||||||||||||||||
Sanjiang [A] | China | Sanjainghe | 7 | - /02 | - /03 | - /04 | - /04 | 72 | 138 | 38 | ||||||||||||||
Changtan [A] | China | H | Tuwushui | 17 | - /03 | - /03 | - /04 | - /04 | 53 | 123 | 29 | |||||||||||||
Yujianhe [A] | China | Guiyang Water Conservancy Bureau | F I W | Wu | 11 | - /02 | - /03 | - /04 | - /05 | 81 | 180 | 105 | 110 | 0.10 | 0.76 | 0.76 | ||||||||
Xiakou [A] | China | H | Juhe | 99 | - /02 | - /03 | - /04 | - /05 | 85 | 192 | 131 | |||||||||||||
Zhaolaihe [A] | China | Changyang Electric Power Bureau | H I W | Sidu | 70 | 12/01 | 03/03 | 05/05 | 10/05 | 107 | 206 | 166 | 255 | curve | (3') | curve | (3') | (3') | 300 | 3000 | 84 126 | 126 103 | (F) | |
Xiaqiao [A] | China | Guangxi Water Conservancy and Electric Power Corporation | H | Long | 49 | - /02 | - /03 | - /05 | - /06 | 68 | 167 | 172 | 226 | |||||||||||
Tangkeng [A] | China | H | Guxi | 12 | - /03 | - /04 | - /05 | - /05 | 66 | (12) | (12) | (12) | ||||||||||||
Dahuashui [A] | China | Wujaing Hydropower Debelopment Co. Ltd. | H | Qingshui | 277 | 01/04 | 04/05 | 11/06 | - /07 | 135 | 198 | 550 | 670 | curve | (3') | curve | (3') | (1) | 300 | 3000 | 81 94 | 81 94 | (F) | |
Niuqiao [A] | China | Niu Qiao Reservoir Development Co. Ltd. | H | Qingtonghe | 26 | - /03 | - /05 | 12/06 | - /07 | 62 | 201 | 710 | ||||||||||||
Qilitang [A] | China | Liuchi | 71 | - /03 | - /04 | - /06 | - /07 | 81 | ||||||||||||||||
Wuchuanshaba [A] | China | H | Wujlang | 9940 | - /04 | - /05 | - /06 | - /07 | 87 | |||||||||||||||
Shaba [A] | China | Guizhou Zhongsui Energy Ltd. | H | Hongdu | 99 | - /04 | - /05 | - /06 | - /07 | 88 | 148 | 67 | 90 | |||||||||||
Longqiao [A] | China | Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province | H R | Yu | 26 | 12/05 | 03/06 | 02/07 | 05/07 | 95 | 156 | 135 | 160 | curve | (3') | curve | (3) | (3) | ||||||
Luojiaohe [A] | China | H | Baibu | 46 | - /05 | - /06 | - /07 | - /07 | 81 | 250 | 110 | |||||||||||||
Qilinguan [A] | China | Nanhe Hydropower Development Ltd. | H | Nanhe | 14 | - /05 | - /06 | - /07 | - /08 | 77 | 140 | 45 | 55 | |||||||||||
Bailianya [A] | China | Anhui Water Resources Development Co. Ltd. | F H I W | Dongpi | 453 | - /05 | - /06 | - /07 | 04/09 | 105 | 422 | 485 | 560 | V | (1) | 0.335 | (1) | 0.335 | (1) | 300 | 3000 | 72 56 | 108 84 | (F) |
Weihou [A] | China | Xilin River Hydropower Development Co. Ltd. | H | Tuoniangiang | 133 | 03/05 | - /06 | 04/08 | - /09 | 82 | ||||||||||||||
Huanghuazhai [A] | China | China Datang Corporation | H | Getu | 175 | 07/06 | - /07 | - /08 | - /08 | 110 | 253 | 280 | 292 | 52 | 96 | (F) | ||||||||
Qingxi [A] | China | Guizhou Qianyuan Power Co. Ltd. | H | Furong | 98 | - /06 | - /07 | - /08 | - /09 | 82 | 166 | 154 | ||||||||||||
Yunlonghe Nº3 [A] | China | Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd. | H | Yunlong | 44 | 03/06 | 04/07 | 04/09 | - /11 | 135 | 119 | 182 | 207 | curve | (3') | curve | (3') | (3') | ||||||
Yunkou [A] | China | Yujiang Hydropower Co. Ltd. | H | Wuni | 35 | 06/07 | 04/08 | 06/09 | - /12 | 119 | 152 | 200 | 205 | |||||||||||
Tianhuaban [A] | China | Niulanjiang Hydropower Development Co. Ltd. | H | Niulan | 66 | 12/06 | - /07 | - /09 | - /10 | 113 | 160 | 182 | 360 | curve | (3') | curve | (3') | ogee | (3) | |||||
Maduhe [A] | China | H | Siyang | 2463 | - /06 | - /08 | - /09 | - /10 | 100 | 185 | ||||||||||||||
Yangjiayuan [A] | China | H W | Tongzhi | 78 | - /07 | - /08 | - /09 | - /10 | 68 | 153 | ||||||||||||||
Shaizhu [A] | China | H | Xima | 3 | - /06 | - /08 | - /10 | - /11 | 72 | 160 | 100 | |||||||||||||
Tiechuanqiao [A] | China | Yupaojiang | 25 | - /07 | - /08 | - /10 | - /11 | 95 | ||||||||||||||||
Sanliping [A] | China | Hubei Energy Group Co. Ltd. | F H | Nanhe | 499 | - /07 | 05/08 | - /10 | - /11 | 133 | 285 | 390 | (1) | (1) | (1) | |||||||||
Naen [A] | China | H | Baidu | 22 | - /06 | - /09 | - /10 | - /11 | 75 | 217 | ||||||||||||||
Saizhu [A] | China | Niulanjiang Hydropower Development Company Ltd. | H | Xima | 3 | 04/06 | - /09 | - /10 | - /11 | 72 | 160 | 107 | 115 | curve | (3') | curve | (3') | (3) | ||||||
Luoboba [A] | China | Enshi Tianfa Electric Ltd. | F H R | Lengshui | 87 | - /07 | - /09 | - /10 | - /11 | 114 | 192 | 21 | 21 | (F) | ||||||||||
Sanglang [A] | China | Sanglang | 15 | - /08 | - /09 | - /11 | - /12 | 90 | ||||||||||||||||
Qinglong [A] | China | Enshi Mawei Valley Hydropower Development Co. Ltd. | H | Maweigou | 29 | 12/08 | - /09 | - /11 | - /12 | 140 | 116 | 212 | ||||||||||||
Linxihe [A] | China | Hubei Huaqing Power Co. Ltd. | H | Loushui | 52 | - /08 | - /10 | - /11 | - /12 | 74 | 146 | |||||||||||||
Wanjiakouzi [A] | China | China Datang Corporation | H | Gexiang | 279 | - /08 | - /09 | - /10 | - /11 | 168 | 413 | 1020 | ||||||||||||
Nam Ngum 5 [A] | Laos | Nam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power) | H | Nam Ting | 314 | 10/08 | 11/11 | 12/12 | 12/12 | 101 | 235 | 298 | 421 | |||||||||||
Shankouyan [A] | China | Shankouyan Hydro Project Development Co. | H | Yuanhe | 105 | 11/07 | - /09 | - /12 | - /13 | 99 | 268 | 272 | ||||||||||||
Dayuhyan [A] | China | Masha | 61 | - /09 | - /10 | - /12 | - /13 | 81 | ||||||||||||||||
Nankangheerji [A] | China | H | Nankang | 31 | - /10 | - /11 | - /12 | - /12 | 68 | 179 | ||||||||||||||
Luntan [A] | China | Luntan Hydraulic Engineering Co. Ltd. | H | Yangcunshui | 180 | 12/08 | - /10 | - /13 | - /14 | 90 | 218 | |||||||||||||
Lizhou [A] | China | China Huadian Corporation | H W | Muli | 190 | - /09 | - /11 | - /13 | - /14 | 132 | 211 | |||||||||||||
Shannipo [A] | China | Guizhou Qianyuan Power Co. Ltd. | H | Beipan | 85 | - /09 | - /11 | - /13 | - /15 | 119 | 205 | 199 | 267 | curve | (3') | curve | (3) | ogee | (3) | |||||
Longtanzui [A] | China | H | Hanshuinanhe | - /10 | - /12 | - /14 | - /15 | 98 | 205 | |||||||||||||||
Lijiahe [A] | China | H | Bahe | 53 | - /11 | - /13 | - /14 | - /15 | 99 | 352 | 370 | 478 | ||||||||||||
Daoliuhe [A] | China | Daoliuhe | - /12 | - /13 | - /14 | - /15 | 60 | 187 | ||||||||||||||||
Shuishimen [A] | China | Tianhe | 37 | - /13 | - /14 | - /15 | - /16 | 86 | 150 | |||||||||||||||
Dayakou [A] | China | H | Nanting | 170 | - /13 | - /14 | - /15 | - /16 | 99 | 300 | 210 | |||||||||||||
Xiangbiling [A] | China | H | Niulanhe | 263 | - /14 | - /15 | - /16 | - /17 | 142 | 459 | ||||||||||||||
Shangshui [A] | China | I W | 12 | - /13 | - /15 | - /17 | - /18 | 58 | 269 | |||||||||||||||
Wugachong [A] | China | H I W | Mabiehe | 99 | - /15 | - /16 | - /17 | - /18 | 108 | 182 | ||||||||||||||
Xiakoutang [A] | China | H | Yu | - /17 | - /18 | - /20 | - /21 | 70 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Dinggeniu
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/74
Start of RCC: -/74
End of RCC: -/78
End of Project: -/79
Specifications
Height: 41 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Sixian Water Resources Bureau
Type: Thin Arch
Purpose(s): Hydropower
River: Leishui
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/79
Start of RCC: -/79
End of RCC: -/81
End of Project: -/82
Specifications
Height: 35 metres
Length: 33 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Shiqi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/68
Start of RCC: -/68
End of RCC: -/91
End of Project: -/93
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 377 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 05/93
End of Project: 02/94
Specifications
Height: 75 metres
Length: 196 metres
Volume of RCC: 103 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.35 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
0.35 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
54 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
103 | Low-lime flyash (ASTM Class F) |
99 |

Details
Country: China
Owner: Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tanghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 06/94
End of Project: -/95
Specifications
Height: 48 metres
Length: 188 metres
Volume of RCC: 55 m3x103
Total volume: 63 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.30 | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
69 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
68 | Low-lime flyash (ASTM Class F) |
85 |

Details
Country: China
Owner: Lanshan County Hydropower Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Xiang
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 45 metres
Length: 150 metres
Volume of RCC: -
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Huangcen Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation
River: Leishui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 56 metres
Length: 147 metres
Volume of RCC: -
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Fengdu Hydropower Bureau
Type: Thin Arch
Purpose(s): Hydropower
River: Huilonghe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/97
End of Project: -/98
Specifications
Height: 90 metres
Length: 158 metres
Volume of RCC: -
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 |
Downstream
Slope | Type |
---|---|
0.76 |
Spillway
Slope | Type |
---|---|
0.76 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Fushan Power Station Management Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Nanxi
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/94
Start of RCC: -/94
End of RCC: -/98
End of Project: -/99
Specifications
Height: 47 metres
Length: 235 metres
Volume of RCC: -
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Wencheng County Kengxiashan Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yuquanxi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/98
End of Project: -/98
Specifications
Height: 34 metres
Length: 80 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Shixing County Power Development Corporation
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Du’anshui (Chengjiang)
Reservoir capacity: 48 m3x106
Construction Dates
Start of Project: 09/99
Start of RCC: 09/99
End of RCC: 01/01
End of Project: 03/01
Specifications
Height: 57 metres
Length: 179 metres
Volume of RCC: 90 m3x103
Total volume: 119 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
105 |
63 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
86 | Low-lime flyash (ASTM Class F) |
80 |

Details
Country: China
Owner: Shimenzi Reservoir Engineering Management Office
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Taxi
Reservoir capacity: 80 m3x106
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 06/01
End of Project: 10/01
Specifications
Height: 110 metres
Length: 176 metres
Volume of RCC: 188 m3x103
Total volume: 211 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.142 | RCC against formwork (GEVR/GE-RCC) |
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
0.18 | RCC against formwork |
Spillway
Slope | Type |
---|---|
crest | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
93 |
62 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |
110 |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xiaoxihe
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/01
End of Project: -/02
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Sichuan Minjiang Hydropower Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Caopohe
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 06/97
Start of RCC: 06/97
End of RCC: 05/02
End of Project: 04/03
Specifications
Height: 132 metres
Length: 230 metres
Volume of RCC: 380 m3x103
Total volume: 392 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.10 |
Downstream
Slope | Type |
---|---|
0.21 | RCC against formwork |
Spillway
Slope | Type |
---|---|
crest | Traditional concrete against formwork |
0.21 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
108 |
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
72 | Low-lime flyash (ASTM Class F) |
89 |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xiaoxihe
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/02
End of Project: -/03
Specifications
Height: 34 metres
Length: 114 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: County Bureau of Hydropower
Type: Thin Arch
Purpose(s): Hydropower
River: Junxi
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 69 metres
Length: 192 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Shaanxi Lan River Hydropower Development Corporation
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Linhe
Reservoir capacity: 147 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 06/03
End of Project: -/04
Specifications
Height: 100 metres
Length: 311 metres
Volume of RCC: 229 m3x103
Total volume: 293 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
74 |
66 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
111 | Low-lime flyash (ASTM Class F) |
111 |

Details
Country: China
Owner: Shanxi Hanjiang Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Renhe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/03
End of Project: -/04
Specifications
Height: 66 metres
Length: 120 metres
Volume of RCC: 81 m3x103
Total volume: 106 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Xifeng County Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Water Supply
River: Yangshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/04
Specifications
Height: 39 metres
Length: 176 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Anhui Hydropower Development Co. Ltd.,
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Xipihe
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 70 metres
Length: 258 metres
Volume of RCC: 130 m3x103
Total volume: 168 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/05
Specifications
Height: 66 metres
Length: 191 metres
Volume of RCC: -
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Sanjainghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/04
Specifications
Height: 72 metres
Length: 138 metres
Volume of RCC: -
Total volume: 38 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Tuwushui
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/04
End of Project: -/04
Specifications
Height: 53 metres
Length: 123 metres
Volume of RCC: -
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Guiyang Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Wu
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 81 metres
Length: 180 metres
Volume of RCC: 105 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 |
Downstream
Slope | Type |
---|---|
0.76 |
Spillway
Slope | Type |
---|---|
0.76 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Juhe
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 85 metres
Length: 192 metres
Volume of RCC: -
Total volume: 131 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Changyang Electric Power Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sidu
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/05
End of Project: 10/05
Specifications
Height: 107 metres
Length: 206 metres
Volume of RCC: 166 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
126 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
126 | Low-lime flyash (ASTM Class F) |
103 |

Details
Country: China
Owner: Guangxi Water Conservancy and Electric Power Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Long
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/06
Specifications
Height: 68 metres
Length: 167 metres
Volume of RCC: 172 m3x103
Total volume: 226 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Guxi
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/05
Specifications
Height: 66 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Wujaing Hydropower Debelopment Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Qingshui
Reservoir capacity: 277 m3x106
Construction Dates
Start of Project: 01/04
Start of RCC: 01/04
End of RCC: 11/06
End of Project: -/07
Specifications
Height: 135 metres
Length: 198 metres
Volume of RCC: 550 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
81 |
94 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
81 | Low-lime flyash (ASTM Class F) |
94 |

Details
Country: China
Owner: Niu Qiao Reservoir Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Qingtonghe
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: 12/06
End of Project: -/07
Specifications
Height: 62 metres
Length: 201 metres
Volume of RCC: -
Total volume: 710 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Liuchi
Reservoir capacity: 71 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/06
End of Project: -/07
Specifications
Height: 81 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Wujlang
Reservoir capacity: 9940 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 87 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Guizhou Zhongsui Energy Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 148 metres
Volume of RCC: 67 m3x103
Total volume: 90 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province
Type: Thin Arch
Purpose(s): Hydropower / Recreation
River: Yu
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 12/05
Start of RCC: 12/05
End of RCC: 02/07
End of Project: 05/07
Specifications
Height: 95 metres
Length: 156 metres
Volume of RCC: 135 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork |
Spillway
Slope | Type |
---|---|
RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Baibu
Reservoir capacity: 46 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/07
Specifications
Height: 81 metres
Length: 250 metres
Volume of RCC: -
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Nanhe Hydropower Development Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Nanhe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 77 metres
Length: 140 metres
Volume of RCC: 45 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Anhui Water Resources Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dongpi
Reservoir capacity: 453 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 04/09
Specifications
Height: 105 metres
Length: 422 metres
Volume of RCC: 485 m3x103
Total volume: 560 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.335 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.335 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
72 |
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
108 | Low-lime flyash (ASTM Class F) |
84 |

Details
Country: China
Owner: Xilin River Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Tuoniangiang
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: 03/05
Start of RCC: 03/05
End of RCC: 04/08
End of Project: -/09
Specifications
Height: 82 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: China Datang Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Getu
Reservoir capacity: 175 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 110 metres
Length: 253 metres
Volume of RCC: 280 m3x103
Total volume: 292 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
52 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
96 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Furong
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 82 metres
Length: 166 metres
Volume of RCC: -
Total volume: 154 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yunlong
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 03/06
Start of RCC: 03/06
End of RCC: 04/09
End of Project: -/11
Specifications
Height: 135 metres
Length: 119 metres
Volume of RCC: 182 m3x103
Total volume: 207 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Yujiang Hydropower Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Wuni
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 06/09
End of Project: -/12
Specifications
Height: 119 metres
Length: 152 metres
Volume of RCC: 200 m3x103
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Niulanjiang Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 113 metres
Length: 160 metres
Volume of RCC: 182 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Siyang
Reservoir capacity: 2463 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 100 metres
Length: 185 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Tongzhi
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 68 metres
Length: 153 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: -
Total volume: 100 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Yupaojiang
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 95 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Hubei Energy Group Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Nanhe
Reservoir capacity: 499 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 133 metres
Length: 285 metres
Volume of RCC: -
Total volume: 390 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Baidu
Reservoir capacity: 22 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 75 metres
Length: 217 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Niulanjiang Hydropower Development Company Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/06
Start of RCC: 04/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: 107 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Enshi Tianfa Electric Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Recreation
River: Lengshui
Reservoir capacity: 87 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 114 metres
Length: 192 metres
Volume of RCC: 21 m3x103
Total volume: 21 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Sanglang
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 90 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Enshi Mawei Valley Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Maweigou
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 140 metres
Length: 116 metres
Volume of RCC: -
Total volume: 212 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Hubei Huaqing Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Loushui
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 74 metres
Length: 146 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: China Datang Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Gexiang
Reservoir capacity: 279 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 168 metres
Length: 413 metres
Volume of RCC: -
Total volume: 1020 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Laos
Owner: Nam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power)
Type: Thin Arch
Purpose(s): Hydropower
River: Nam Ting
Reservoir capacity: 314 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 12/12
End of Project: 12/12
Specifications
Height: 101 metres
Length: 235 metres
Volume of RCC: 298 m3x103
Total volume: 421 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Shankouyan Hydro Project Development Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Yuanhe
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 99 metres
Length: 268 metres
Volume of RCC: -
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Masha
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 81 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Nankang
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 68 metres
Length: 179 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Luntan Hydraulic Engineering Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yangcunshui
Reservoir capacity: 180 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: -/13
End of Project: -/14
Specifications
Height: 90 metres
Length: 218 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: China Huadian Corporation
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Muli
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/14
Specifications
Height: 132 metres
Length: 211 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/15
Specifications
Height: 119 metres
Length: 205 metres
Volume of RCC: 199 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Hanshuinanhe
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/14
End of Project: -/15
Specifications
Height: 98 metres
Length: -
Volume of RCC: -
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Bahe
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/14
End of Project: -/15
Specifications
Height: 99 metres
Length: 352 metres
Volume of RCC: 370 m3x103
Total volume: 478 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Daoliuhe
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 60 metres
Length: 187 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Tianhe
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 86 metres
Length: -
Volume of RCC: -
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Nanting
Reservoir capacity: 170 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 99 metres
Length: 300 metres
Volume of RCC: -
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Niulanhe
Reservoir capacity: 263 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 142 metres
Length: 459 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 58 metres
Length: 269 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Mabiehe
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 108 metres
Length: 182 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Yu
Reservoir capacity: -
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 70 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Search again