Xiangjiaba
Download PDF data sheet
Particulars
Owner: unknown
Designer: Hydrochina Zhongnan Engineering Corporation
Contractor: SinoHydro Construction Bureau NÂș3 Co. Ltd.
Statistics
Type: unknown
Purpose(s): unknown
Reservoir capacity: 52 m3x106
Height: 162 metres
Length: 909 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/06 (— 2006)
Start of RCC: —/10 (— 2010)
End of RCC: —/14 (— 2014)
End of Project: —/16 (— 2016)