Xiaoxihe
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Insitute of Investigation and Design for Hydropower Projects, Guangdong Province
Contractor: 2nd (Guangdong) Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 5 m3x106
Height: 62 metres
Length: 103 metres
Volume of RCC: 47 m3x103
Total volume: 66 m3x103
Construction Dates
Start of Project: —/99 (— 1999)
Start of RCC: —/00 (— 2000)
End of RCC: —/01 (— 2001)
End of Project: —/02 (— 2002)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |
