Yeywa
Download PDF data sheet
Yeywa completed

Particulars
Owner: unknown
Designer: Colenco Power Engineering Ltd.
Contractor: Gezhouba Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 2600 m3x106
Height: 137 metres
Length: 680 metres
Volume of RCC: 2473 m3x103
Total volume: 2843 m3x103
Construction Dates
Start of Project: 10/01 (October 2001)
Start of RCC: 02/06 (February 2006)
End of RCC: 12/08 (December 2008)
End of Project: 12/10 (December 2010)
Country: Myanmar
River: Myitnge
DMS Co-ordinates: 21˚40'31.18"N, 96˚28'24.32"E
DD Co-ordinates: 21.675327, 96.473419
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Natural pozzolan (ASTM Class N) |