Zimari
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 2 m3x106
Height: 37 metres
Length: 126 metres
Volume of RCC: unknown
Total volume: 80 m3x103
Construction Dates
Start of Project: —/18 (— 2018)
Start of RCC: —/21 (— 2021)
End of RCC: —/23 (— 2023)
End of Project: —/24 (— 2024)
Country: Turkey
River: Zimari
DMS Co-ordinates: 41˚54'53"N, 34˚26'51"E
DD Co-ordinates: 41.914722, 34.447498