Zongo II
Download PDF data sheet
Zongo II under construction

Particulars
Owner: unknown
Designer: unknown
Contractor: SinoHydro Wang Anquan
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 20 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 05/12 (May 2012)
Start of RCC: —/15 (— 2015)
End of RCC: —/16 (— 2016)
End of Project: —/17 (— 2017)
Country: DR Congo
River: unknown
DMS Co-ordinates: 4˚46'14.74"S, 14˚53'38.99"E
DD Co-ordinates: -4.770761, 14.894164
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
